Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-00922
StatusFinaled
Name EDWARDS THEATRES 9 SCREEN CINEMA
Site Address 760 W BROAD ST
Project NameEDWARDS THEATRE BODO 7
Customer Number 
ePlanReviewNo
Description
(EDWARDS THEATRES 9 SCREEN CINEMA - BODO BLDG #7) This building is fire sprinklered for fire area and for the multitheater complex. To construct a 56,493 square foot multitheater complex (2,407 square foot 1st story, 45,536 square foot 2nd story, 8,550 square foot 2nd story mezzanine) within an existing 138,293 square foot building. Work is to include 2-hr fire barrier walls, interior nonbearing walls, open stairways, 2-hr enclosed stairways, 2 public restrooms accessible to the disabled, 1 unisex restroom accessible to the disabled, 1 employee restroom accessible to the disabled, 1-hr exit passageways, elevated floors, suspended ceilings, millwork, and finishes. All work shall comply with the approved drawings, the plan review report, and applicable codes. The fire sprinkler system shall comply with 2002 NFPA 13 as regulated by the Fire Department. Construction of "EDWARDS" sign NOT allowed untill Design Review approval. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/13/20073/13/2007 DONE
Details
BLD-Final3/7/20073/8/20073/8/2007APASS
DetailsDave Hannah
James Woodbury ###-#### ok for perm occ
BLD-Aging Inspection3/7/20073/7/20073/7/2007PPASS
DetailsDave Hannah
fyi 410 need final sch
FIRE-Final Inspection3/5/20073/6/20073/7/2007APASS
DetailsForrest France
Fire life safety finaled.
BLD-Other11/8/200511/10/200511/14/2005PDONE
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Final11/10/200511/10/200511/14/2005PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore temp occ issued c/n on site also needs other trades to sign off perm and shell finaled c.c
FIRE-Final Inspection11/9/200511/10/200511/10/2005APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission. An additional emergency light needs to be added in the west projector room and fire extinguishers installed. Per contractor these items will be completed by the evening of 11-11-05. The fire alarm and fire sprinkler permits need to be finaled.
FIRE-Final Inspection11/7/200511/7/200511/7/2005PFAIL
DetailsForrest France
Door is not installed yet at box office storage room below escalators, provide fire extinguisher at first floor elevator lobby, repair emergency light at stair landing by theatre #7, temporary max occupant load signs have been installed, door hardware is missing at mezz door, inspection concluded at this time project is not ready for final inspection.
BLD-Framing/Rough-in11/4/200511/7/200511/7/2005APART
DetailsDave Hannah
Dave,please call Alex by 9am to discuss the 12x12 glass openings.; Phone #: ###-#### Internet Inspection Request from: Ben Kos ok to use glass that is spected by door manufactor
BLD-Final11/3/200511/4/200511/4/2005ANR
DetailsDave Hannah
john --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie still needs other trades to sign off
BLD-Final11/3/200511/3/200511/4/2005PPART
DetailsDave Hannah
Please call Dennis Re: Final Inspection Internet Inspection Request from: Alex Monge walked project with dinnis but still needs other trades to signoff temp
FIRE-Final Inspection11/3/200511/4/200511/4/2005AFAIL
DetailsForrest France
See correction notice for a list of defficient items, not all items reviewed at this inspection, several issues remain.
BLD-Other10/25/200510/27/200510/31/2005PCANC
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos out of time
BLD-Other10/17/200510/20/200510/24/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos checking double stair ok to proceed
BLD-Framing/Rough-in10/19/200510/19/200510/19/2005APART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos stair towers
BLD-Other10/17/200510/18/200510/19/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos stair towers
BLD-Framing/Rough-in10/10/200510/13/200510/14/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in10/10/200510/11/200510/12/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos proofit meeting
BLD-Other10/3/200510/6/200510/7/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos tickit both and front entry way at ground floor ok to cover but still need to fire proof pipes on west wall
BLD-Framing/Rough-in10/5/200510/6/200510/6/2005APART
DetailsDave Hannah
Please call Dennis Harter in the AM. Thanks.....10:00 Internet Inspection Request from: Alex Monge tickit both area
BLD-Other10/3/200510/4/200510/5/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in9/26/20059/29/20059/30/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in9/26/20059/27/20059/28/2005PDONE
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos ada doors and landings
BLD-Framing/Rough-in9/19/20059/22/20059/23/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in9/19/20059/20/20059/21/2005PPART
DetailsDave Hannah
Dennis Harter; Phone #: ###-#### Internet Inspection Request from: Ben Kos 2hr fire protection under main stairs
BLD-Framing/Rough-in9/19/20059/19/20059/19/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos looked at ground floor hallway wall framing every thing oki but need arch to ok top of wall attachment deff than plans
BLD-Framing/Rough-in9/16/20059/16/20059/19/2005PCANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Conference9/13/20059/15/20059/16/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos rest room area ok to cover
BLD-Framing/Rough-in9/12/20059/13/20059/13/2005PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos needs to patch fire proofing in restrooms area
BLD-Framing/Rough-in9/12/20059/13/20059/13/2005APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Ben Kos
BLD-Framing/Rough-in8/29/20059/1/20059/2/2005PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore walked project with dinnis
BLD-Framing/Rough-in8/29/20058/30/20058/30/2005PNR
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/29/20058/29/20058/30/2005PCANC
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/22/20058/25/20058/30/2005PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore exit #2 door size carl w working with arc
BLD-Framing/Rough-in8/22/20058/23/20058/24/2005PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore stair tower no 2 crew working on walls
BLD-Framing/Rough-in8/18/20058/19/20058/19/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore crews working on stair towers
BLD-Conference8/13/20058/15/20058/15/2005APART
DetailsDave Hannah
Concern with Stair# 3 intermediate landing and column interference. please review before we construct. Talk to Alex or Dennis. Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in8/8/20058/11/20058/11/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/9/20058/9/20058/10/2005PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/8/20058/9/20058/9/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/5/20058/5/20058/8/2005PPART
DetailsDave Hannah
wall penetration//dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa plumbing penetrations in floor top ok crew will do bottom later
BLD-Framing/Rough-in8/1/20058/4/20058/4/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in8/1/20058/2/20058/3/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa walked project with george
BLD-Framing/Rough-in7/27/20057/28/20057/28/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/21/20057/25/20057/25/2005APART
DetailsDave Hannah
see dennis framing ok to date
BLD-Framing/Rough-in7/18/20057/21/20057/21/2005APART
DetailsTom Arcoraci
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip ok
BLD-Framing/Rough-in7/19/20057/19/20057/19/2005PPART
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in7/18/20057/19/20057/19/2005ACANC
DetailsTom Arcoraci
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/8/20057/14/20057/14/2005APART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/8/20057/12/20057/12/2005APART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/5/20057/7/20057/8/2005APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa all areas as of today ok
BLD-Framing/Rough-in6/29/20056/30/20056/30/2005APASS
DetailsDave Hannah
Rough framing inspection. Internet Inspection Request from: Alex Monge second floor framing ok to cover
BLD-Framing/Rough-in6/24/20056/24/20056/27/2005PPART
DetailsDave Hannah
Partial framing inspection for wall close-up. We also would like to discuss a regular schedule for inspections.; Phone #: ###-#### Internet Inspection Request from: Alex Monge int steel stud walls ok to cover