Permit Information
Permit NumberBLD05-00926
StatusFinaled
Name SACO CONSTRUCTION
Site Address 412 S 13TH ST
Project NamePlaza Mixed Use-Parking Garage
Customer Number 
ePlanReviewNo
Description
Plaza Mixed Use (parking garage, grading, drainage & underground utilities phase only) - To construct a new 30,000 sq.ft. basement parking garage under two separate buildings and construct a 7,869 sq.ft. first floor parking garage located under future residential units, per City Ordinance # 6339, for mixed construction. The installation of three hour fire walls and three hour horizontal assemblies will be required to separate different types of construction. Additional work covered under this permit includes onsite grading, landscaping and parking lot. NOTE: The installation of a NFPA 13 fire sprinkler system is required throughout this building. All construction per the approved plans and attached comment list. 6/30/05 letter from Phil Kushlan placing a hold on issuance of this permit. 10/4/05 letter received from CCDC releasing permit for issuance. (see letters scanned into document section of this permit). Refer to BLD 05-02204, BLD 05-02750 & BLD 06-00693 for the buildings located above the horizontal assembly. MJP DRH 04-00241 CUP 04-00087 (PLAN MODIFICATION) 1/6/06 Received plans and payment for modification to the orginal building permit for changing parking deck and foundation for the north end of this building.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20088/12/20088/14/2008APASS
DetailsDave Hannah
Barb----Dave this was given temp on 5-2-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 5-2-07. Please let me know...thanks Phone #: ###-#### ok to go perm
DOC - Permit Finaled  8/14/2008 DONE
Code Occupancy Approval4/21/20084/21/20084/21/2008PPASS
DetailsJoe R Venneman
Landscaping meets bld requirements
FIRE-Final Inspection3/27/20083/27/20083/28/2008PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection3/3/20083/3/20083/3/2008 PASS
DetailsDave Hannah
work in progress
BLD-Final7/19/20077/20/20077/20/2007ANR
DetailsDave Hannah
daryl Phone #: ###-#### need fire to go perm
BLD-Final5/1/20075/1/20075/1/2007PPART
DetailsDave Hannah
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ
FIRE-Final Inspection5/1/20075/1/20075/1/2007PNR
DetailsForrest France
Need project related fire sprinkler final prior to life safety inspection request.
FIRE-Final Inspection5/1/20075/1/20075/1/2007 PART
Okayed for Temporary occupancy.
BLD-Final4/27/20074/30/20074/30/2007AFAIL
DetailsDave Hannah
Darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trades signed off walked project made a punch list
BLD-Other4/16/20074/17/20074/17/2007APART
DetailsDave Hannah
Darryl ceiling grid; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover after other trades ok
BLD-Concrete3/21/20063/21/20063/23/2006PPART
DetailsDave Hannah
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north pt slabe
BLD-Concrete3/20/20063/21/20063/21/2006APART
DetailsDave Hannah
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north pt slab