Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD05-00928
StatusFinaled
Name GEORGE FISCHER CONSTRUCTION
Site Address 910 N ORCHARD ST
Project NameBOISE CREDIT UNION
Customer Number 
ePlanReviewNo
Description
(BOISE CREDIT UNION) Exterior remodel to an existing building to replace exterior stairs, provide a new roof structure over existing second story balcony/deck, and refinish deck surface per approved plans, structural engineering, and CZC05-00040. Work to include miscellaneous demolition work, some new roof structure framing, new steel stairway with supports and reinforced concrete footings, new handrails, new guards, some new roof covering work, and electrical work. Special Inspection required for structural steel welding. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20066/9/20066/9/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/9/2006 at 6:59:26 AM. Contact: ###-####.
DOC - Permit Finaled6/9/20066/9/20066/9/2006PPASS
DetailsJim Storey
BLD-Final6/5/20066/6/20066/6/2006PCANC
DetailsDave Hannah
larry Note: call 1/2 hr prior please; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection6/5/20066/6/20066/6/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final5/24/20065/25/20065/25/2006PNR
DetailsJim Storey
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need fire and framing c/n idem
FIRE-Final Inspection5/19/20065/19/20065/19/2006PFAIL
DetailsTroy Cobbley
Provide blank instead of the keyed lock on the exterior door.
BLD-Conference5/17/20065/18/20065/18/2006AFAIL
DetailsJim Storey
larry call 1hour prior to insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection5/17/20065/17/20065/17/2006PFAIL
DetailsTroy Cobbley
No approved plans on site. No inspection performed.
BLD-Final5/17/20065/17/20065/17/2006PCANC
DetailsTony Young
LARRY nOTE: LATE AS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final5/17/20065/17/20065/17/2006PCANC
DetailsTony Young
Larry Fischer, earl afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final5/16/20065/17/20065/17/2006AFAIL
DetailsTony Young
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
need to call for a conf.,,, stairs not per code
BLD-Foundation4/11/20064/11/20064/11/2006PCANC
DetailsTom Arcoraci
BLD-Foundation4/10/20064/11/20064/11/2006APART
DetailsTom Arcoraci
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in3/27/20063/28/20063/28/2006APART
DetailsTom Arcoraci
larry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie arhc to ok changes as built