BLD-Final | 9/15/2005 | 9/15/2005 | 9/15/2005 | P | PASS |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ
|
Permanent Occupancy | | 9/15/2005 | 9/15/2005 | | DONE |
|
|
|
|
BLD-Final | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PART |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Letitia ok for temp occ needs to finish elec and onnings
|
FIRE-Final Inspection | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
BLD-Conference | 7/29/2005 | 7/29/2005 | 8/1/2005 | P | DONE |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Conference | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | DONE |
Forrest France
|
|
|
On site discussion with Kent the GC regarding duct smoke detection, remote annunciators, egress lighting, building address, door hardware and location of fire extinguishers.
|
BLD-Energy code compliance | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | PASS |
Dave Hannah
|
|
|
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 7/12/2005 | 7/13/2005 | 7/13/2005 | P | PASS |
Dave Hannah
|
|
|
KENT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate
|
BLD-Conference | 7/5/2005 | 7/6/2005 | 7/6/2005 | A | DONE |
Dave Hannah
|
|
|
walked the project
|
BLD-Conference | 7/5/2005 | 7/5/2005 | 7/5/2005 | P | CANC |
Tom Arcoraci
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | CANC |
Tony Young
|
|
|
kent ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wants 425
|
FIRE-Conference | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | DONE |
Forrest France
|
|
|
On site discussion with Kent the GC regarding requirements for the main entry/exit door hardware, swing direction and clear width.
|