Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-00978
StatusFinaled
Name PETRA INC
Site Address 850 W GOWEN RD
Project NameNORCO
Customer Number 
ePlanReviewNo
Description
Norco Acetylene Compressing Plant - To construct a new 8,260 square foot, one story, steel framed industrial building to be used as an acetylene gas compressing plant and a 1,950 square foot, steel framed, roof covered dock and related site improvements. The acetylene plant will consist of a 1,360 sq. ft., equipment room, a 285 sq. ft. mechanical room, a 455 sq. ft. office space with single restroom and small break room, a 4,400 sq. ft. charging room and two 880 sq. ft. covered loading docks at the east and west sides of the charging room. This building will be fire sprinklered with the exception of Equipment Room #104 The remote 1,950 sq. ft. covered dock is being reviewed as an outside storage area for hazardous materials. All construction per the approved plans and attached comment list. JCM These buildings were modified to change the building structures from engineer steel to SPECK (pre-engineered steel structures).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 5/4/20075/4/2007 DONE
Details
FIRE-Final Inspection4/25/20074/26/20074/26/2007PPASS
DetailsForrest France
Items on correction notice have been completed, final fire life safety inspection passed.
Code Occupancy Approval4/24/20074/24/20074/24/2007PPASS
DetailsDena Gambrel
04-24-06 After speaking to Cody and looking at new plans submitted, Cody signed off on new plans. Final occupancy signed. O.K. to release bond.
BLD-Aging Inspection2/23/20072/23/20072/23/2007 DEFR
DetailsJim Storey
sent to cod only outstanding isue to final out project.
BLD-Aging Inspection12/18/200612/18/200612/20/2006 DEFR
DetailsJim Storey
BLD-Aging Inspection10/16/200610/16/200610/16/2006 DEFR
DetailsJim Storey
pending p&z
BLD-Aging Inspection8/14/20068/14/20068/14/2006 FAIL
DetailsJim Storey
pending others
BLD-Aging Inspection6/13/20066/13/20066/13/2006 PASS
DetailsJim Storey
BLD-Final4/12/20064/13/20064/13/2006PPART
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles temp ok pending plm/p&z /fire perm sign offs. is aproved as resbmitals on file with planreview with respect to will winslow.
FIRE-Final Inspection4/6/20064/7/20064/7/2006APART
DetailsTroy Cobbley
Plant manager ken goicoechea and jim ross signed for and verified the piping pressure tests, verified piping type/compatibility, color code and marking of the piping, verification of the PNID, installation and calabration of critical equipment, high level lime/sump alarm, acetone tank (seismic bracing not required per IBC), generator relief valves, compressor pressure switch verified, pressure relief verified on the discharge piping, transmission belts are of the static conducting type, piping pressure test conducted per ANSI B31.3 per documentation, matrix provided. Per jim ross the sensors will be tested monthly until a history is set and then at the manufactures recommendations. I have either verified the paper documentation or have witness the above items visually. Per Dave Hanniman a temporary occupancy is ok pending the repair of the north east exit sign/emergency light. Fire extinguishers at the field dock are to be mounted as discussed.
FIRE-Final Inspection4/5/20064/6/20064/6/2006PDEFR
DetailsForrest France
Inspection to be completed 4/7
FIRE-Final Inspection3/31/20063/31/20063/31/2006PFAIL
DetailsTroy Cobbley
Need to final fire alarm permit and provide corrections as marked on the fire dept. plan review comments.
Code Occupancy Approval3/30/20063/30/20063/30/2006PFAIL
DetailsDena Gambrel
03-24-06 Failed site inspection. No rock mulch per plans. Doug needs to either have planner o.k. no mulch, get mulch installed or get a price for the cost and bond. A correction notice was left with Doug.
03-30-06 Phone call from Doug. They will bond. Amount of Bond will be $10,727.00.
BLD-Grading Inspection3/28/20063/28/20063/28/2006 DONE
inspection done by D.Erskine on 03/23/06
BLD-Aging Inspection3/21/20063/21/20063/22/2006 PART
DetailsJim Storey
walked job and adressed out standing isues.
BLD-Framing/Rough-in1/17/20061/17/20061/17/2006PNR
DetailsJim Storey
ceiling grid///doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceilling ok pending ele. need to verify fire stopping before aproval or provide access.
BLD-Other1/10/20061/11/20061/11/2006APART
DetailsJim Storey
fire caulk inspection///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need listing for fire stopping . cleanouts and max anular space 5 inches 2 2 1/2 steel pipe.
FIRE-Final Inspection1/3/20061/4/20061/5/2006APART
DetailsForrest France
Limited use approval granted with Sam Rogers permission for the covered outside dock structure ONLY. No use or occupancy allowed for the main building at this time.
FIRE-Final Inspection12/21/200512/22/200512/22/2005APART
DetailsForrest France
On site confrence to discuss requirements for use approval at the separate covered loading dock structure.
BLD-Framing/Rough-in11/22/200511/22/200511/22/2005PPASS
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wall screw insp. ok ok to insulate.
BLD-Framing/Rough-in11/14/200511/15/200511/15/2005APART
DetailsJim Storey
doug ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/20/200510/21/200510/21/2005APART
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore recived engineering to insp. # 6 girt sheet meatal atchment to studs ok need to verify at nex insp that #12 sidding screws are not into studs and only into straping.
BLD-Conference10/5/200510/6/200510/6/2005AFAIL
DetailsJim Storey
there is a plan modification for here in review because they are changing from a structural bldg to a pre-engineered bldg.///doug ###-####
BLD-Other9/7/20059/8/20059/8/2005APART
DetailsMike Jordan
grout & cmu wall inspection///Doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing9/7/20059/8/20059/8/2005APASS
DetailsMike Jordan
pour at 10:30///doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation8/29/20058/30/20058/30/2005PPASS
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa slab at dock ok hair pins.
BLD-Foundation8/24/20058/25/20058/25/2005PPASS
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation8/22/20058/23/20058/23/2005APASS
DetailsJim Storey
brian --will pour at 12:30??; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing8/17/20058/18/20058/18/2005APASS
DetailsJim Storey
late am please//doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing8/17/20058/17/20058/17/2005PPART
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation8/15/20058/16/20058/16/2005APASS
DetailsJim Storey
wall//doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation8/9/20058/9/20058/9/2005PPASS
DetailsJim Storey
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation8/5/20058/8/20058/8/2005PPASS
DetailsMike Jordan
grout pour and CMU block walls inspection///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. no joint reinforcement from 0 to 6 ft. elev. at east wall, fill bldg. Eng. waS NOTIFIED and will send RFI
BLD-Foundation8/4/20058/5/20058/5/2005APASS
DetailsMike Jordan
doug ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Interior stemwalls.
BLD-Footing7/28/20057/29/20057/29/2005APASS
DetailsJim Storey
Pouring at 10:00 am doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore comprest gas loading area ft ok to east side of site ok.
BLD-Footing7/21/20057/25/20057/25/2005PPART
DetailsJim Storey
& rebar inspection please////doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore