Permanent Occupancy | | 5/4/2007 | 5/4/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/25/2007 | 4/26/2007 | 4/26/2007 | P | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, final fire life safety inspection passed.
|
Code Occupancy Approval | 4/24/2007 | 4/24/2007 | 4/24/2007 | P | PASS |
Dena Gambrel
|
|
|
04-24-06 After speaking to Cody and looking at new plans submitted, Cody signed off on new plans. Final occupancy signed. O.K. to release bond.
|
BLD-Aging Inspection | 2/23/2007 | 2/23/2007 | 2/23/2007 | | DEFR |
Jim Storey
|
|
|
sent to cod only outstanding isue to final out project.
|
BLD-Aging Inspection | 12/18/2006 | 12/18/2006 | 12/20/2006 | | DEFR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/16/2006 | 10/16/2006 | 10/16/2006 | | DEFR |
Jim Storey
|
|
|
pending p&z
|
BLD-Aging Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 | | FAIL |
Jim Storey
|
|
|
pending others
|
BLD-Aging Inspection | 6/13/2006 | 6/13/2006 | 6/13/2006 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/12/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles temp ok pending plm/p&z /fire perm sign offs. is aproved as resbmitals on file with planreview with respect to will winslow.
|
FIRE-Final Inspection | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | PART |
Troy Cobbley
|
|
|
Plant manager ken goicoechea and jim ross signed for and verified the piping pressure tests, verified piping type/compatibility, color code and marking of the piping, verification of the PNID, installation and calabration of critical equipment, high level lime/sump alarm, acetone tank (seismic bracing not required per IBC), generator relief valves, compressor pressure switch verified, pressure relief verified on the discharge piping, transmission belts are of the static conducting type, piping pressure test conducted per ANSI B31.3 per documentation, matrix provided. Per jim ross the sensors will be tested monthly until a history is set and then at the manufactures recommendations. I have either verified the paper documentation or have witness the above items visually. Per Dave Hanniman a temporary occupancy is ok pending the repair of the north east exit sign/emergency light. Fire extinguishers at the field dock are to be mounted as discussed.
|
FIRE-Final Inspection | 4/5/2006 | 4/6/2006 | 4/6/2006 | P | DEFR |
Forrest France
|
|
|
Inspection to be completed 4/7
|
FIRE-Final Inspection | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | FAIL |
Troy Cobbley
|
|
|
Need to final fire alarm permit and provide corrections as marked on the fire dept. plan review comments.
|
Code Occupancy Approval | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | FAIL |
Dena Gambrel
|
|
|
03-24-06 Failed site inspection. No rock mulch per plans. Doug needs to either have planner o.k. no mulch, get mulch installed or get a price for the cost and bond. A correction notice was left with Doug. 03-30-06 Phone call from Doug. They will bond. Amount of Bond will be $10,727.00.
|
BLD-Grading Inspection | 3/28/2006 | 3/28/2006 | 3/28/2006 | | DONE |
|
|
|
inspection done by D.Erskine on 03/23/06
|
BLD-Aging Inspection | 3/21/2006 | 3/21/2006 | 3/22/2006 | | PART |
Jim Storey
|
|
|
walked job and adressed out standing isues.
|
BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | NR |
Jim Storey
|
|
|
ceiling grid///doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceilling ok pending ele. need to verify fire stopping before aproval or provide access.
|
BLD-Other | 1/10/2006 | 1/11/2006 | 1/11/2006 | A | PART |
Jim Storey
|
|
|
fire caulk inspection///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need listing for fire stopping . cleanouts and max anular space 5 inches 2 2 1/2 steel pipe.
|
FIRE-Final Inspection | 1/3/2006 | 1/4/2006 | 1/5/2006 | A | PART |
Forrest France
|
|
|
Limited use approval granted with Sam Rogers permission for the covered outside dock structure ONLY. No use or occupancy allowed for the main building at this time.
|
FIRE-Final Inspection | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PART |
Forrest France
|
|
|
On site confrence to discuss requirements for use approval at the separate covered loading dock structure.
|
BLD-Framing/Rough-in | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | PASS |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wall screw insp. ok ok to insulate.
|
BLD-Framing/Rough-in | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PART |
Jim Storey
|
|
|
doug ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 10/20/2005 | 10/21/2005 | 10/21/2005 | A | PART |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore recived engineering to insp. # 6 girt sheet meatal atchment to studs ok need to verify at nex insp that #12 sidding screws are not into studs and only into straping.
|
BLD-Conference | 10/5/2005 | 10/6/2005 | 10/6/2005 | A | FAIL |
Jim Storey
|
|
|
there is a plan modification for here in review because they are changing from a structural bldg to a pre-engineered bldg.///doug ###-####
|
BLD-Other | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PART |
Mike Jordan
|
|
|
grout & cmu wall inspection///Doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PASS |
Mike Jordan
|
|
|
pour at 10:30///doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 8/29/2005 | 8/30/2005 | 8/30/2005 | P | PASS |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa slab at dock ok hair pins.
|
BLD-Foundation | 8/24/2005 | 8/25/2005 | 8/25/2005 | P | PASS |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | PASS |
Jim Storey
|
|
|
brian --will pour at 12:30??; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 8/17/2005 | 8/18/2005 | 8/18/2005 | A | PASS |
Jim Storey
|
|
|
late am please//doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | PART |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 8/15/2005 | 8/16/2005 | 8/16/2005 | A | PASS |
Jim Storey
|
|
|
wall//doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Jim Storey
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 8/5/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Mike Jordan
|
|
|
grout pour and CMU block walls inspection///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. no joint reinforcement from 0 to 6 ft. elev. at east wall, fill bldg. Eng. waS NOTIFIED and will send RFI
|
BLD-Foundation | 8/4/2005 | 8/5/2005 | 8/5/2005 | A | PASS |
Mike Jordan
|
|
|
doug ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Interior stemwalls.
|
BLD-Footing | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | PASS |
Jim Storey
|
|
|
Pouring at 10:00 am doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore comprest gas loading area ft ok to east side of site ok.
|
BLD-Footing | 7/21/2005 | 7/25/2005 | 7/25/2005 | P | PART |
Jim Storey
|
|
|
& rebar inspection please////doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|