BLD-Final | 8/25/2006 | 8/25/2006 | 8/29/2006 | P | PASS |
Dave Hannah
|
|
|
Jeff W. ###-####
|
BLD-Final | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PASS |
Dave Hannah
|
|
|
jeff- ###-#### for occ--call 1st before insp
|
DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 8/29/2006 | 8/29/2006 | 8/29/2006 | | BOND |
|
|
|
Grading was not done according to the approved plan. Contractor has bonded $6,000.00 to ensure that corrections are made. Grading and drainage is conditionally approved.
|
BLD-Final | 8/23/2006 | 8/24/2006 | 8/24/2006 | P | NR |
Dave Hannah
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs needs terry records final
|
BLD-Energy code compliance | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Dave Hannah
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Energy code compliance | 4/12/2006 | 4/12/2006 | 4/12/2006 | P | NR |
Mike Jordan
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 3rd floor was complete, noted to contractor ok to start sheetrock on 3rd floor only. Also reveiwed engineering for posts in garage and beams on main level. Beams in main level ok, additional post werre added in garage as per engineering.
|
BLD-Framing/Rough-in | 4/10/2006 | 4/11/2006 | 4/11/2006 | P | PART |
Mike Jordan
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All items on c/n have beenresolved except for engineering paperwork, which will be on site for energy code insp. ok to insulate.
|
BLD-Framing/Rough-in | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | FAIL |
Dave Hannah
|
|
|
shawn; Phone #: ###-#### Note: please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles c/n on site do not insulate
|
BLD-Foundation | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 9:36:45 PM. Contact: ###-####.8 side walls ok to pour
|
BLD-Foundation | 8/16/2005 | 8/17/2005 | 8/18/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 4:11:49 PM. Contact: ###-####.
|
BLD-Footing | 8/18/2005 | 8/18/2005 | 8/18/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 4:11:49 PM. Contact: ###-####. ok to pour
|
BLD-Foundation | 8/12/2005 | 8/15/2005 | 8/16/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/12/2005 at 4:11:49 PM. Contact: ###-####. no plans on site
|