Permanent Occupancy | | 6/28/2007 | 6/28/2007 | | DONE |
|
|
|
|
BLD-Final | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall everything ok but for zoning and code enforcment
|
FIRE-Final Inspection | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 4/30/2007 | 5/2/2007 | 5/2/2007 | A | DEFR |
Forrest France
|
|
|
Inspection rescheduled per conversation with building engineer.
|
FIRE-Final Inspection | 4/30/2007 | 5/2/2007 | 4/30/2007 | A | CANC |
Forrest France
|
|
|
jim - fire life safety ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Andrea Whiteman
|
FIRE-Final Inspection | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | FAIL |
Troy Cobbley
|
|
|
All items on the correction notice have been taken care of. I signed the sign-off card. But befor I could make a computer entry I was contacted by Sam ROges about a sprinkler issue above the lobby ceiling. I told Dennis that there would be no sign off from me until the issue is resolved. He is going to take care of the issue and then contact me.
|
BLD-Final | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | PART |
Dave Hannah
|
|
|
going over c/n items
|
BLD-Final | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for temp occ c/n ada issuse
|
BLD-Final | 2/2/2007 | 2/2/2007 | 2/5/2007 | P | PART |
Dave Hannah
|
|
|
ok for temp occ c/n to follow needs other trafdes to go perm and ada issuse addressed
|
FIRE-Final Inspection | 2/2/2007 | 2/2/2007 | 2/2/2007 | P | PART |
Forrest France
|
|
|
Approved temporary occupancy, final approval pending the completion of all items on the correction notice left on site and discussed with general contractor.
|
FIRE-Final Inspection | 1/30/2007 | 1/31/2007 | 2/1/2007 | P | FAIL |
Forrest France
|
|
|
Missing directional arrows at the 8th floor exit signs, repair the exit sign at the pool room, missing emergency lighting at the elevator lobby and adjacent hall on the first floor.
|
BLD-Final | 1/29/2007 | 1/30/2007 | 1/30/2007 | P | NR |
Dave Hannah
|
|
|
katie - swimming pool; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | DEFR |
Forrest France
|
|
|
Rescheduled per conversation with contractor.
|
BLD-Framing/Rough-in | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover wall between garage and hotel
|
BLD-Conference | 1/9/2007 | 1/9/2007 | 1/10/2007 | P | DONE |
Dave Hannah
|
|
|
dennis - 2 hr wall enclosure ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PART |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/5/2007 | 1/5/2007 | 1/8/2007 | P | DEFR |
Dave Hannah
|
|
|
|
BLD-Wall cover | 1/4/2007 | 1/4/2007 | 1/5/2007 | A | NR |
Dave Hannah
|
|
|
Dennis, ###-####
|
BLD-Wall cover | 12/11/2006 | 12/12/2006 | 12/13/2006 | A | PART |
Dave Hannah
|
|
|
###-#### - dennis
|
BLD-Other | 11/27/2006 | 11/28/2006 | 11/29/2006 | P | PART |
Dave Hannah
|
|
|
###-#### - dennis note: t-bar tile cover up on 4th floor ok to cover after fire oks
|
BLD-Final | 11/13/2006 | 11/14/2006 | 11/14/2006 | A | PART |
Dave Hannah
|
|
|
###-#### - dennis part elec rooms 5thru 11 ok
|
BLD-Final | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | NR |
Dave Hannah
|
|
|
###-#### - dennis
|
BLD-Final | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | NR |
Dave Hannah
|
|
|
###-#### - dennis
|
BLD-Final | 10/26/2006 | 11/3/2006 | 11/7/2006 | A | CANC |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 11/2/2006 | 11/2/2006 | A | DEFR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 11/1/2006 | 11/2/2006 | A | DEFR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 10/31/2006 | 11/1/2006 | A | DEFR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 10/30/2006 | 10/30/2006 | A | NR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Other | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | DONE |
Dave Hannah
|
|
|
dennis - ###-#### - wall cover up
|
BLD-Framing/Rough-in | 10/2/2006 | 10/4/2006 | 10/4/2006 | P | PART |
Dave Hannah
|
|
|
interior 5th thru 11th floor \\###-#### dennis x10 room fire proofing ok
|
BLD-Wall cover | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Dave Hannah
|
|
|
ok to cover elev lobbys 2 and 3rd floors
|
BLD-Conference | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PART |
Dave Hannah
|
|
|
Dave, need inspection on exterior? TMC will start brick tomorrow, so do we need a screw sign off on the dens gold? dennis part ok to start brick firs two floors
|
BLD-Wall cover | 9/9/2006 | 9/11/2006 | 9/11/2006 | A | PART |
Dave Hannah
|
|
|
Dave, our door labels are stamped into the frames and hard to read, could you check them out next time you are here. Dennis door frames are marked 1 and 1/2 hr
|
BLD-Wall cover | 9/7/2006 | 9/8/2006 | 9/8/2006 | A | FAIL |
Dave Hannah
|
|
|
Dave, need the 4th floor shaft wall, and 10th 11th floor ceilings, and check the stair handrailing for code. Thanks Dennis ; Phone #: ###-#### ned to rework shafts
|
BLD-Wall cover | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Dave Hannah
|
|
|
Dave, pool eq room and 11th elev lobby ok to cover
|
BLD-Wall cover | 8/26/2006 | 8/28/2006 | 8/28/2006 | A | NR |
Dave Hannah
|
|
|
Dave, pool eq room and 11th elev lobby
|
BLD-Wall cover | 8/21/2006 | 8/23/2006 | 8/23/2006 | A | NR |
Dave Hannah
|
|
|
Dave, Pool eq room 4th floor cover up. Dennis; Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | DONE |
Dave Hannah
|
|
|
Dave, t-bar ceiling areas. Dennis
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PART |
Dave Hannah
|
|
|
Dave, t-bar ceiling areas. Dennis ok to cover 9th floor
|
BLD-Wall cover | 8/16/2006 | 8/16/2006 | 8/17/2006 | P | PART |
Dave Hannah
|
|
|
Dave, t-bar ceiling areas. Dennis ok to cover 8th floor
|
FIRE-Sprinkler Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Forrest France
|
|
|
Inspection requested for sprinkler cover at the guest rooms adjacent to the temp. elevator at the 10th floor is okay, the 11th floor guest room at this location is not ready for inspection.
|
FIRE-Conference | 8/10/2006 | 8/14/2006 | 8/14/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss occupancy requirements for the fourth floor parking area.
|
BLD-Wall cover | 8/9/2006 | 8/10/2006 | 8/10/2006 | P | PART |
Dave Hannah
|
|
|
walk through on 4th and x10 rooms, misc t-bar areas. ok to drop 7th floor ceiling tile and cover ceilings x10 restrooms 6th and 7th fl
|
BLD-Wall cover | 8/4/2006 | 8/4/2006 | 8/4/2006 | A | PART |
Dave Hannah
|
|
|
Dave, late am would be best. or early afternoon. 6th floor. thanks Dennis ok to cover hard lids
|
BLD-Wall cover | 8/2/2006 | 8/3/2006 | 8/3/2006 | A | PART |
Dave Hannah
|
|
|
ok to cover lobby ceiling
|
BLD-Wall cover | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | PART |
Dave Hannah
|
|
|
Please view the 11th floor hallway framing for cover. Thannk you. hallway hard lids ok to cover
|
BLD-Wall cover | 7/25/2006 | 7/26/2006 | 7/26/2006 | P | PASS |
Dave Hannah
|
|
|
dave 7th and 8th floor corridor
|
BLD-Conference | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | PASS |
Dave Hannah
|
|
|
Re-inpection at 7th & 9th floor plumbing pipe fire caulking for wall cover.
|
BLD-Wall cover | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PART |
Dave Hannah
|
|
|
Framing inspection for levels 8, 9, 10 & 11 room # x10. Please call Ray to view.; Phone #: ###-#### ok to cover walls
|
BLD-Conference | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | PART |
Dave Hannah
|
|
|
Fire Caulking room x10 6th and 7th floor ok to cover walls
|
BLD-Final | 7/20/2006 | 7/21/2006 | 7/21/2006 | A | FAIL |
Dave Hannah
|
|
|
Dave, thought you might want to walk the job. Dennis
|
BLD-Wall cover | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | PART |
Dave Hannah
|
|
|
5th floor drop ceilings in rooms ok to cover
|
BLD-Other | 7/11/2006 | 7/12/2006 | 7/13/2006 | P | FAIL |
Dave Hannah
|
|
|
dennis Note: cover up on the 5th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles room ceilings
|
BLD-Framing/Rough-in | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PART |
Dave Hannah
|
|
|
south half 11th floor heaters ok to cover
|
BLD-Wall cover | 7/6/2006 | 7/6/2006 | 7/6/2006 | P | PART |
Dave Hannah
|
|
|
ok to cover canopy
|
BLD-Wall cover | 6/30/2006 | 7/5/2006 | 7/5/2006 | A | PART |
Dave Hannah
|
|
|
inspection 11th floor heater closets north half ok to cover
|
BLD-Wall cover | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PART |
Dave Hannah
|
|
|
Dave please see Paul for lobby Ceiling re-inspection. ok to cover hard lids in lobby and lobby restrooms after other trades have signed off
|
BLD-Wall cover | 6/23/2006 | 6/27/2006 | 6/28/2006 | P | PART |
Dave Hannah
|
|
|
5th floor walls and 11th floor ceilings in rooms ok to cover
|
BLD-Wall cover | 6/23/2006 | 6/26/2006 | 6/27/2006 | P | NR |
Dave Hannah
|
|
|
|
BLD-Conference | 6/15/2006 | 6/15/2006 | 6/15/2006 | P | PART |
Dave Hannah
|
|
|
early afternoon 10 floor south half room ceilings ok to cover
|
BLD-Wall cover | 6/9/2006 | 6/13/2006 | 6/14/2006 | P | PART |
Dave Hannah
|
|
|
ext walls 5th fl ok to cover drop ceiling north half 10th floor ok to cover in rooms
|
BLD-Wall cover | 6/9/2006 | 6/12/2006 | 6/12/2006 | A | PART |
Dave Hannah
|
|
|
7th and 8th floor hallway harde lid areas ok to cover
|
BLD-Wall cover | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PART |
Dave Hannah
|
|
|
ground floor lobby ok to cover
|
BLD-Wall cover | 6/5/2006 | 6/6/2006 | 6/7/2006 | P | PART |
Dave Hannah
|
|
|
fire proofing at floor levels in stair towers ok to start walls
|
BLD-Wall cover | 5/30/2006 | 5/31/2006 | 5/31/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Conference | 5/24/2006 | 5/31/2006 | 5/31/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Conference | 5/24/2006 | 5/30/2006 | 5/30/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####ext wall 11th floor ok to cover
|
BLD-Wall cover | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PART |
Dave Hannah
|
|
|
Fire proofing inspection at 9th floor ceiling. Please call Ray when you arrive to inspect. 9th floor room drop ceilings ok to cover
|
BLD-Conference | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### south half of 10th floor ok to cover walls
|
BLD-Wall cover | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### north half of 10th floor ok to cover int walls
|
BLD-Wall cover | 5/17/2006 | 5/22/2006 | 5/22/2006 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 5/17/2006 | 5/19/2006 | 5/19/2006 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | PART |
Dave Hannah
|
|
|
walked 10th floor int walls not ready but ext wall ok to cover
|
BLD-Wall cover | 5/9/2006 | 5/16/2006 | 5/17/2006 | P | DEFR |
Dave Hannah
|
|
|
|
BLD-Wall cover | 5/9/2006 | 5/15/2006 | 5/15/2006 | P | PART |
Dave Hannah
|
|
|
ceilings on south half 8th floor rooms ok to cover
|
BLD-Wall cover | 5/9/2006 | 5/12/2006 | 5/15/2006 | P | PART |
Dave Hannah
|
|
|
ext walls 10th floor ok to insulate
|
BLD-Wall cover | 5/9/2006 | 5/11/2006 | 5/11/2006 | P | PART |
Dave Hannah
|
|
|
ceiling for rooms north half 8th floor ok to cover
|
BLD-Wall cover | 5/9/2006 | 5/10/2006 | 5/10/2006 | P | PART |
Dave Hannah
|
|
|
ok to cover walls on south half of 9th floor
|
BLD-Wall cover | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PART |
Dave Hannah
|
|
|
ok to insulate south half of 9th floor
|
BLD-Wall cover | 5/2/2006 | 5/5/2006 | 5/8/2006 | P | DEFR |
Dave Hannah
|
|
|
Please call Dennis or Ray when you arrive.
|
BLD-Conference | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Dave Hannah
|
|
|
dave, YMC and Devcon would like to go over the elevator shaft fire rating one more time. this would be at the roof level. give me a call to set a time. thanks Dennis; Phone #: ###-####
|
BLD-Wall cover | 5/2/2006 | 5/4/2006 | 5/4/2006 | P | PART |
Dave Hannah
|
|
|
Please call dennis or Ray when you arrive. furcaces the rest of 8th floor and walls north half of 9th ok to cover
|
BLD-Wall cover | 5/2/2006 | 5/3/2006 | 5/4/2006 | P | DEFR |
Dave Hannah
|
|
|
Please contact Dennis or Ray when you arrive. out of time for the day
|
BLD-Wall cover | 5/2/2006 | 5/2/2006 | 5/3/2006 | P | PART |
Dave Hannah
|
|
|
Please call Dennis or Ray when you arrive.
|
BLD-Wall cover | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | PASS |
Tom Arcoraci
|
|
|
8th floor floor holes ok 7th floor drops in rooms ok
|
BLD-Wall cover | 4/21/2006 | 4/27/2006 | 4/27/2006 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### wip
|
BLD-Wall cover | 4/21/2006 | 4/26/2006 | 4/26/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok to insulste 9th floor ext walls ok to cover 6th floor heater units
|
BLD-Wall cover | 4/21/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### north half of 8th floor ok to cover walls
|
BLD-Wall cover | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | FAIL |
Dave Hannah
|
|
|
Dave, could we get you first thing monday, say by 9am. for the heater closets at the 6th floor. Thanks Dennis; Phone #: ###-####
|
BLD-Wall cover | 4/21/2006 | 4/24/2006 | 4/24/2006 | A | CANC |
Dave Hannah
|
|
|
Dave, could we get you first thing monday, say by 9am. for the heater closets at the 6th floor. Thanks Dennis; Phone #: ###-####
|
BLD-Wall cover | 4/14/2006 | 4/21/2006 | 4/21/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### wip
|
BLD-Wall cover | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PART |
Dave Hannah
|
|
|
Dave, RAy say we are ready. south side 6th floor hard lids ok to cover
|
BLD-Wall cover | 4/14/2006 | 4/20/2006 | 4/20/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/14/2006 | 4/19/2006 | 4/20/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### wip
|
BLD-Wall cover | 4/14/2006 | 4/18/2006 | 4/19/2006 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/14/2006 | 4/17/2006 | 4/17/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/14/2006 | 4/14/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok to install hard lids on north half of 6th floor
|
BLD-Wall cover | 4/8/2006 | 4/13/2006 | 4/14/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/12/2006 | 4/13/2006 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/11/2006 | 4/11/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/10/2006 | 4/10/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/10/2006 | 4/10/2006 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/7/2006 | 4/7/2006 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### pent house ok to cover
|
BLD-Wall cover | 4/3/2006 | 4/6/2006 | 4/6/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/5/2006 | 4/5/2006 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/4/2006 | 4/4/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ext walls on 8th floor
|
BLD-Wall cover | 4/3/2006 | 4/3/2006 | 4/3/2006 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 3/28/2006 | 3/31/2006 | 4/3/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### north half int walls ok to cover on 7th floor
|
BLD-Wall cover | 3/28/2006 | 3/30/2006 | 3/30/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### 8th floor ext wall fire proofing ok
|
BLD-Wall cover | 3/28/2006 | 3/29/2006 | 3/30/2006 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### out of time rescheduled
|
BLD-Wall cover | 3/22/2006 | 3/28/2006 | 3/29/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### south half of 6th floor mins 3 rooms ok to cover
|
BLD-Wall cover | 3/27/2006 | 3/27/2006 | 3/28/2006 | P | FAIL |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-#### floor and ceiling fire proofing not completed on south half of 6th floor
|
BLD-Wall cover | 3/20/2006 | 3/27/2006 | 3/27/2006 | A | FAIL |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-#### south half of 6th floor
|
BLD-Wall cover | 3/20/2006 | 3/24/2006 | 3/27/2006 | A | NR |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-####
|
BLD-Framing/Rough-in | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | NR |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-####
|
BLD-Conference | 3/23/2006 | 3/23/2006 | 3/24/2006 | P | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### 6th floor ok to cover int walls on north half of floor
|
BLD-Wall cover | 3/20/2006 | 3/23/2006 | 3/24/2006 | P | PART |
Dave Hannah
|
|
|
call me to see if you need to come by. Dennis; Phone #: ###-#### 7th floor ok to insulate ext walls
|
BLD-Wall cover | 3/22/2006 | 3/23/2006 | 3/23/2006 | A | PART |
Dave Hannah
|
|
|
dave some time in am like 9:30, thanks Dennis; Phone #: ###-#### 5th floor plumbing fire caulking ok
|
BLD-Wall cover | 3/20/2006 | 3/22/2006 | 3/22/2006 | P | PART |
Dave Hannah
|
|
|
Dave, cover up walls, ; Phone #: ###-#### ok to insulate ext walls on 7th floor
|
BLD-Wall cover | 3/20/2006 | 3/21/2006 | 3/21/2006 | A | PART |
Dave Hannah
|
|
|
Dave, cover up walls, i have 10 am meeting so eairler will be better. ; Phone #: ###-#### north half of 6th floor ok to cover ext wall
|
BLD-Wall cover | 3/10/2006 | 3/17/2006 | 3/17/2006 | A | FAIL |
Dave Hannah
|
|
|
Dave, cover up of walls; Phone #: ###-#### wrong kind if vapor bar on 6th flr
|
BLD-Wall cover | 3/10/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Dave Hannah
|
|
|
Dave, fire proofing inspections give me a call, Dennis; Phone #: ###-#### work in progress oh 5th and 6th floors
|
BLD-Conference | 3/10/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Dave Hannah
|
|
|
Dave, cover up of walls; Phone #: ###-#### ok to open 1st,second and third floors of parking garage
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Forrest France
|
|
|
Correction notice items related to the parking garage ground level, 2nd and 3rd levels have been verified for completion, fire alarm and sprinkler associated with the garage 1st,2nd and 3rd levels for temporary occupancy in this limited area ONLY are completed.
|
BLD-Wall cover | 3/10/2006 | 3/15/2006 | 3/16/2006 | A | PART |
Dave Hannah
|
|
|
Dave, fire proofing inspections give me a call, Dennis; Phone #: ###-#### work in progress on 5th and 6th floors
|
BLD-Final | 3/14/2006 | 3/15/2006 | 3/16/2006 | A | NR |
Dave Hannah
|
|
|
Dave please contact me on time, Forest has to look at the e-lights one more time, like to get the sign off tomorrow am. thanks Dennis; Phone #: ###-#### still needs fire F/L/S sign off
|
BLD-Wall cover | 3/10/2006 | 3/14/2006 | 3/15/2006 | P | PART |
Dave Hannah
|
|
|
Dave, fire proofing inspections give me a call, Dennis; Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | FAIL |
Forrest France
|
|
|
Provide keys in knox box, relocate temporary fence at alley to allow access to fire dept. WPI and FDC, provide signage at the door to the riser/pump room, provide lockout for air compressor circut switches, provide emergency egress illumination for the exit corridor from the fire command center, install work table for the fire command center.
|
BLD-Wall cover | 3/7/2006 | 3/14/2006 | 3/14/2006 | A | CANC |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Final | 3/13/2006 | 3/14/2006 | 3/14/2006 | A | NR |
Dave Hannah
|
|
|
Dave, Forest will walk tomorrow at 8:30 for the life safety, if you could be down here shortly after that say 9:30 to walk. thanks Dennis; Phone #: ###-####
|
FIRE-Final Inspection | 3/13/2006 | 3/14/2006 | 3/14/2006 | A | FAIL |
Forrest France
|
|
|
Life safety Inspection for the parking structure ground level, 2nd, and 3rd floors for temp. occupancy failed due to non-functional emergency lights at the 2nd and 3rd levels, fire extinguishers at two locations are mounted too high, minor fire sprinkler issues,emergency lighting at stair #3 not tested, fire apparatus access roads must meet requirements of IFC 2003 503.2.1 and 503.4.
|
BLD-Final | 3/7/2006 | 3/10/2006 | 3/14/2006 | P | NR |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
FIRE-Final Inspection | 3/10/2006 | 3/13/2006 | 3/13/2006 | P | NR |
Forrest France
|
|
|
The project related alarm and sprinkler must be approved prior to life safety final.
|
BLD-Wall cover | 3/7/2006 | 3/13/2006 | 3/13/2006 | A | PART |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 3/7/2006 | 3/10/2006 | 3/10/2006 | A | FAIL |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-#### still working on fire proofing
|
BLD-Final | 3/7/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 3/7/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 3/7/2006 | 3/8/2006 | 3/8/2006 | A | DONE |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 2/28/2006 | 3/7/2006 | 3/8/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 3/1/2006 | 3/6/2006 | 3/6/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### fite protection 6th floor
|
BLD-Framing/Rough-in | 3/3/2006 | 3/3/2006 | 3/6/2006 | P | PART |
Dave Hannah
|
|
|
Dave, Hanna, AM inspection ; Phone #: ###-#### 5th and 6th floor fire proofing
|
BLD-Wall cover | 2/28/2006 | 3/3/2006 | 3/6/2006 | A | PART |
Dave Hannah
|
|
|
Dave, Hanna, AM inspection ; Phone #: ###-#### 5th and 6th floor
|
BLD-Wall cover | 3/2/2006 | 3/2/2006 | 3/3/2006 | P | PART |
Dave Hannah
|
|
|
fire protection floor and columns 5th flr
|
BLD-Wall cover | 3/1/2006 | 3/2/2006 | 3/2/2006 | A | CANC |
Tom Arcoraci
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Dave Hannah
|
|
|
Dave, Hanna, AM inspection ; Phone #: ###-#### ext beam fire proofing ok6th fl
|
BLD-Framing/Rough-in | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | NR |
Dave Hannah
|
|
|
Inspection---please call Dennis Harter at ###-#### Internet Inspection Request from: Alex Monge
|