BLD-Final | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/27/2005 at 8:45:47 AM. Contact: ###-####. ok for c.c
|
BLD-Final | 7/13/2005 | 7/14/2005 | 7/15/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/13/2005 at 2:00:50 PM. Contact: ###-####. ok to occ needs mec on new gas piping
|
FIRE-Final Inspection | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
FIRE-Final Inspection | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | FAIL |
Forrest France
|
|
|
Remove thumbturn bolt lock on back kitchen door NW corner, post max occupant load sign, remove thumbturn bolt lock on exit door at brewing room (see plan review notes #22 and #24).
|
BLD-Conference | 7/7/2005 | 7/8/2005 | 7/8/2005 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/7/2005 at 1:22:35 PM. Contact: ###-####.
|
FIRE-Conference | 7/7/2005 | 7/8/2005 | 7/8/2005 | A | DONE |
Forrest France
|
|
|
On site discussion with Chris regarding door hardware requirements, fire ext. placement, building addressing, type 2 hood, occ. load sign, and emergency light testing.
|
BLD-Wall cover | 6/15/2005 | 6/15/2005 | 6/16/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 7:11:10 AM. Contact: ###-####. ok to cover wall between bar tanks and partions after plmb r/i
|
FIRE-Conference | 6/15/2005 | 6/16/2005 | 6/16/2005 | A | DONE |
Forrest France
|
|
|
Discussed emergency lighting placement and exit sign locations with Tim the GC and electrical contractor.
|