Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-01114
StatusFinaled
Name CACHE VALLEY ELECTRIC
Site Address 1161 W RIVER ST Unit: 210
Project NameFOREST RIVER IX-2ND FLR
Customer Number 
ePlanReviewNo
Description
(VERIZON WIRELESS)(FOREST RIVER IX-SUITE 210) To remodel an existing 471 sq.ft. tenant space on the 2nd floor for a wireless communication room and install associated rooftop equipment per approved plans and CZC05-00051. Work to include, construction of interior paritions within room to house equipment, installation of two condensers on roof, installation of wireless antenas on each corner of roof, any wood used within the building must be Fire retardant treated per section 603.1, this building is fully fire sprinklered for one-hour substitution any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/26/20067/26/20067/26/2006APASS
DetailsDave Hannah
Please call before inspector arrives so that I may meet them and let them into the site. Contact name Donovan; Phone #: ###-#### Internet Inspection Request from: Donovan Waldenmyer
DOC - Permit Finaled7/26/20067/26/20067/26/2006PPASS
DetailsDave Hannah
BLD-Final6/30/20066/30/20066/30/2006PDONE
DetailsDave Hannah
Call prior to inspector arriving at the site, so we are able to let him/her into the site. As a side note: I also scheduled a final Mechanical Inspection today w/ Dixie Fellows. Let me know if there might be a scheduling conflict to get her inspection finaled before I get the building inspection finaled. Thanks; Phone #: 208-###-#### James Internet Inspection Request from: Donovan Waldenmyer
BLD-Final6/30/20066/30/20066/30/2006AFAIL
DetailsDave Hannah
Call prior to inspector arriving at the site, so we are able to let him/her into the site. As a side note: I also scheduled a final Mechanical Inspection today w/ Dixie Fellows. Let me know if there might be a scheduling conflict to get her inspection finaled before I get the building inspection finaled. Thanks; Phone #: 208-###-#### James Internet Inspection Request from: Donovan Waldenmyer duct work pentrating third floor not to code
BLD-Framing/Rough-in4/17/20064/17/20064/17/2006PPASS
DetailsDave Hannah
Jay -- sheetrock, nailing reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Other4/12/20064/14/20064/14/2006PPART
DetailsDave Hannah
Jay -- sheetrock; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong sheetrock ok
BLD-Framing/Rough-in4/12/20064/13/20064/13/2006PPART
DetailsDave Hannah
Jay; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong // for plywood 4-12-06 eus fr rated ply wood ok ok to cover
BLD-Framing/Rough-in4/12/20064/14/20064/12/2006PCANC
DetailsDave Hannah
jay Note: plywood was fire rated; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles /// Cancel per Jay (Cache Valley Electric) 4-12-06 eus
BLD-Framing/Rough-in3/22/20063/23/20063/23/2006APASS
DetailsDave Hannah
Jay; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong