Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01216
StatusFinaled
Name K2 CONSTRUCTION
Site Address 605 S AMERICANA BLVD
Project NameCaledonia Station
Customer Number 
ePlanReviewNo
Description
Caledonia Station (Addition and Remodel) - to add a 5545 sq. ft. two story type IIIB addition to the existing 2,275 sq. ft one story building. The building will have three separate tenant spaces with the existing space plus addition at 2905 sq. ft. the other 1st floor tenant space with vanilla finish at 2240 sq. ft. and the second floor space with vanilla finish at 2675 sq. ft. Other work includes remodeling of the existing building, all site improvements, paving and landscaping per approved plans. This building is proposed to have a fire alarm system. Areas of the two story addition are 2870 sq. ft. first floor and 2675 second floor. The building will not be fire sprinklered. Exterior walls are masonry and the entire building meets requirements for Type IIIB construction. Separate permits and possible plans required for occupancy of each tenant space. MIS PERMIT FOR CALEDONIA FINE FABRICS - MIS05-00107 for C.O.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/18/20069/19/20069/19/2006APASS
DetailsDave Hannah
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection9/18/20069/18/20069/18/2006PPASS
DetailsForrest France
Fire life safety passed inspection.
BLD-Other8/2/20068/2/20068/2/2006PPASS
DetailsMike Jordan
shawn - Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/5/20067/5/20067/5/2006PPASS
DetailsDave Hannah
shane ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front oning
BLD-Energy code compliance6/9/20066/12/20066/12/2006APART
DetailsDave Hannah
shane ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor back half ok to cover
BLD-Energy code compliance6/7/20066/8/20066/8/2006APART
DetailsDave Hannah
shane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ground floor walls
BLD-Framing/Rough-in6/5/20066/5/20066/5/2006PPART
DetailsDave Hannah
shane; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley framing ground floor back area ,restroom and elev on 1st and second floors ok
FIRE-Conference5/5/20065/8/20065/8/2006PDONE
DetailsForrest France
Confrence to discuss requirements related to duct smoke detection for HVAC unit shutdown.
BLD-Framing/Rough-in4/17/20064/18/20064/18/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/17/2006 at 1:56:28 PM. Contact: ###-####. ok to cover roof need to verify east to west blk added between trusses north side missed butt joint on sheathing.
BLD-Framing/Rough-in4/4/20064/5/20064/5/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/4/2006 at 4:26:23 PM. Contact: ###-####. secton floor nailing and straping ok ok to cover
BLD-Framing/Rough-in4/4/20064/4/20064/4/2006PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/4/2006 at 8:55:39 AM. Contact: ###-####. second floor nailing not per plan
BLD-Footing1/18/20061/18/20061/18/2006PPART
DetailsDave Hannah
shane; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie crew working on rebar talked with forman they need to clean out mud they will have spec inspection sign offf and test concrete