BLD-Final | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | PASS |
Dave Hannah
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
BLD-Other | 8/2/2006 | 8/2/2006 | 8/2/2006 | P | PASS |
Mike Jordan
|
|
|
shawn - Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PASS |
Dave Hannah
|
|
|
shane ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front oning
|
BLD-Energy code compliance | 6/9/2006 | 6/12/2006 | 6/12/2006 | A | PART |
Dave Hannah
|
|
|
shane ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor back half ok to cover
|
BLD-Energy code compliance | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PART |
Dave Hannah
|
|
|
shane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ground floor walls
|
BLD-Framing/Rough-in | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PART |
Dave Hannah
|
|
|
shane; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley framing ground floor back area ,restroom and elev on 1st and second floors ok
|
FIRE-Conference | 5/5/2006 | 5/8/2006 | 5/8/2006 | P | DONE |
Forrest France
|
|
|
Confrence to discuss requirements related to duct smoke detection for HVAC unit shutdown.
|
BLD-Framing/Rough-in | 4/17/2006 | 4/18/2006 | 4/18/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/17/2006 at 1:56:28 PM. Contact: ###-####. ok to cover roof need to verify east to west blk added between trusses north side missed butt joint on sheathing.
|
BLD-Framing/Rough-in | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/4/2006 at 4:26:23 PM. Contact: ###-####. secton floor nailing and straping ok ok to cover
|
BLD-Framing/Rough-in | 4/4/2006 | 4/4/2006 | 4/4/2006 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/4/2006 at 8:55:39 AM. Contact: ###-####. second floor nailing not per plan
|
BLD-Footing | 1/18/2006 | 1/18/2006 | 1/18/2006 | P | PART |
Dave Hannah
|
|
|
shane; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie crew working on rebar talked with forman they need to clean out mud they will have spec inspection sign offf and test concrete
|