Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01220
StatusFinaled
Name BINYONS
Site Address 350 N MILWAUKEE ST Unit: 1188
Project NameBTS - #1188
Customer Number 
ePlanReviewNo
Description
(BINYON'S)(BOISE TOWNE SQUARE-SPACE 1188) To remodel an existing 3077 sq ft retail tenant space located on the first floor per approved plans. Work to include, refacing existing storefront all frame work is to remain, installation of new ceiling tiles in an existing suspended ceiling system, the lighting is existing and will remain, construction of new noncombustible partitions, construction of a new accessible restroom, miscelaneous related interior finishes. NOTE: This building is fully fire sprinklered and contains a smoke evacuation system, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. (rmh)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/16/20058/17/20058/17/2005APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final8/15/20058/16/20058/16/2005APART
DetailsTom Arcoraci
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm pending fire sign off
Permanent Occupancy 8/16/20058/16/2005 DONE
Details
FIRE-Final Inspection8/10/20058/11/20058/11/2005APART
DetailsTroy Cobbley
robert; Phone #: ###-#### Inspection was for the smoke evac system. It operated correctly from the two spot type smoke detectors located at the two front exit/entrance. I also inspected the exit signs and emergency lights. They passed as well. I notified the general contractor that the door to the lab with the keyed deadbolt is not approved type of hardware.
BLD-Framing/Rough-in8/8/20058/8/20058/9/2005PPASS
DetailsJim Storey
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need to verify at final fire stopping .
BLD-Framing/Rough-in7/11/20057/11/20057/11/2005PPART
DetailsJim Sly
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
80% framed and OK to cover. Advised Contractor to call for insp so we can verify that all holes and penitrations through tenant demising walls are fixed (patched)..... B 4 celing tile install.