BLD-Final | 2/26/2007 | 2/27/2007 | 2/27/2007 | P | PASS |
Dave Hannah
|
|
|
JERRY ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 2/27/2007 | 2/27/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Forrest France
|
|
|
Corrections noted at previous inspections have been completed, fire life safety is acceptable. Noted permanent signage at the doors to the FACP and fire riser rooms to be posted prior to structural final as agreed.
|
FIRE-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | FAIL |
Troy Cobbley
|
|
|
It does not appear that any notes were read as requested on the previous inspection. Exit signs are missing at the main exits. Existing exit lights are inoperative. Closures have not been installed. Occupant load sign has not been provided. Knox box is not provided and so on.
|
BLD-Final | 2/5/2007 | 2/5/2007 | 2/5/2007 | P | NR |
Dave Hannah
|
|
|
john - call 30 min piror to inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs fire spk final
|
FIRE-Final Inspection | 10/31/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Forrest France
|
|
|
Need fire sprinkler and alarm finals prior to BLD life safety final, also noted extinguishers are overdue certification, missing max occupant load sign for the assembly area, missing door closure at mech. room, some items related to fire code review notes are not addressed, instructed contractor to review notes before next inspection.
|
BLD-Conference | 6/28/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Dave Hannah
|
|
|
pat ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley work in progress
|
BLD-Framing/Rough-in | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/6/2005 at 10:43:27 AM. Contact: ###-####. second floor office area and rest rooms ok to cover
|