BLD-Final | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | PASS |
Tony Young
|
|
|
re-inspection; Phone #: ###-####
|
DOC - Permit Finaled | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 3/29/2006 | 3/30/2006 | 3/30/2006 | P | PART |
Tony Young
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok on inside but,, need to finish exterior stair handrail and guard rail,, also on upper bedroom door egress
|
BLD-Grading Inspection | 3/30/2006 | 3/30/2006 | 3/30/2006 | | BOND |
|
|
|
Grading and drainage have not been completed at the above mentioned address. To finish the incomplete items listed below the engineer has recommended a bond of $6,000.00. The items yet to be completed include:
1. The retaining wall behind the house.
2. Final grading.
3. Roof drainage system.
4. Providing an easement for the roof drain that ties into the adjacent lot to the west.
Upon submission of the $6,000.00 bond the grading and drainage is conditionally approved
|
BLD-Final | 3/29/2006 | 3/29/2006 | 3/29/2006 | P | NR |
Jim Sly
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/20/2006 at 8:04:19 AM. Contact: ###-####. wip on front and side retaining walls and stair walls
|
BLD-Footing | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | PASS |
Tom Arcoraci
|
|
|
Brandon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 3/9/2006 | 3/10/2006 | 3/9/2006 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/9/2006 at 3:12:17 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 9 2006 3:43PM.
|
BLD-Energy code compliance | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 1/3/2006 | 1/4/2006 | 1/4/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/3/2006 at 11:24:03 PM. Contact: ###-####. wip,, Ingo Stroup coming out also (via contractor) to get energy star?
|
BLD-Wall cover | 1/2/2006 | 1/3/2006 | 1/3/2006 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/2/2006 at 10:26:06 PM. not ready,, and c/n not complete
|
BLD-Framing/Rough-in | 12/29/2005 | 12/29/2005 | 12/29/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 8:02:24 AM. Contact: ###-####. Needs to install floor to floor straps, finish nailing all simpson hangars, provide solid blocking at the 3 11 7/8 ml down to basement.
|
BLD-Framing/Rough-in | 12/27/2005 | 12/27/2005 | 12/27/2005 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### need trades and seal pack 1st
|
BLD-Framing/Rough-in | 12/23/2005 | 12/27/2005 | 12/27/2005 | A | NR |
Tony Young
|
|
|
erick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/21/2005 | 12/22/2005 | 12/22/2005 | P | NR |
Tony Young
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need trades 1st,, seal pack,, walk through conf.,, shear no complete on upper areas
|
BLD-Foundation | 9/30/2005 | 9/30/2005 | 10/3/2005 | P | PASS |
Dave Hannah
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 9/9/2005 | 9/9/2005 | 9/15/2005 | P | PART |
Mike Jordan
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|