BLD-Final | 5/7/2008 | 5/8/2008 | 5/8/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 9:19:02 AM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | PASS |
Jim Sly
|
|
|
|
Code Occupancy Approval | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Carol Montgomery
|
|
|
Meets Compliance. Pass.
|
Code Occupancy Approval | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | CANC |
Carol Montgomery
|
|
|
All landscaping needs to be completed (sprinkler system back filled, sod and bark put in) (plants appear to be here) or bonded for. Bike rack needs to be put in place and gates on trash enclosures need to be installed. (Someone told him all he needed was to have code enf. come out and look at the color of the building.
|
BLD-Final | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/24/2008 at 9:49:47 AM. Contact: ###-####.
|
BLD-Conference | 3/25/2008 | 3/25/2008 | 3/25/2008 | A | PEND |
Jim Sly
|
|
|
Waiting for P/W and Zoning finals
|
FIRE-Final Inspection | 3/21/2008 | 3/24/2008 | 3/24/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PEND |
Jim Sly
|
|
|
Call Dave at .....###-####...... Dave is working on getting Fire, Public works, and Zoning signed off......
|
FIRE-Final Inspection | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide address facing the street, provide fire lane signage as per one of the three options per the review comments and provide the fire dept. access/compact parking as per the approved plans.
|
BLD-Framing/Rough-in | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/18/2008 at 2:07:08 PM. Contact: ###-####.
|
BLD-Conference | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | DONE |
Jim Sly
|
|
|
Call Dave at ###-#### Dave was not aware that Bldg was not finaled. He will work on it.
|
BLD-Aging Inspection | 2/14/2008 | 2/14/2008 | 2/14/2008 | | PEND |
Jim Sly
|
|
|
Need to meet with Dave ###-####....to discuss requirements for final.
|
BLD-Framing/Rough-in | 1/30/2006 | 1/31/2006 | 2/1/2006 | A | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shear walls OK
|
BLD-Foundation | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | PASS |
Jim Sly
|
|
|
as late as possible please///john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 9/20/2005 | 9/20/2005 | 9/20/2005 | P | PASS |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2500 PSI design
|