Permit Information
Permit NumberBLD05-01462
StatusFinaled
Name JIM CAMPBELL (GC REP)
Site Address 109 N 10TH ST
Project NameGEM NOBLE BLDG
Customer Number 
ePlanReviewNo
Description
(RIEBE'S SHOE REPAIR - GEM NOBLE BUILDING - 1ST STORY) This building will be fully fire sprinklered for area and story increase. To remodel an existing 788 square foot tenant space for a new retail sales and service tenant. This space is located on the 1st story (Northeast corner) of an existing 2 story with basement historic building (11,400 square foot basement, 11,400 square foot 1st story, 11,500 square foot 2nd story). This tenant is moving from another location in this building. A permit to renovate the entire building (BLD04-01154) was issued on August 18, 2004. Work is to include interior nonbearing walls, a restroom accessible to the disabled, a service counter accessible to the disabled, and a shoe shine stand. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system will be installed as part of the building renovation and shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20097/20/20097/20/2009APASS
DetailsDave Hannah
Your request to final?
FIRE-Final Inspection7/15/20097/20/20097/20/2009APASS
DetailsForrest France
Fire life safety approved for final.
BLD-Aging Inspection6/4/20096/4/20096/4/2009 PASS
DetailsDave Hannah
BLD-Aging Inspection3/23/20093/23/20093/23/2009 PASS
DetailsDave Hannah
BLD-Aging Inspection11/7/200811/7/200811/13/2008 PASS
DetailsDave Hannah
BLD-Final8/12/20088/13/20088/14/2008APART
DetailsDave Hannah
Barb--Dave....the last activity note was from you that ok for temp on 4-20-07 perm when everyone else goes perm......could you please check on the status of this and let me know? Thanks Phone #: ###-####
BLD-Conference3/14/20083/14/20083/14/2008APASS
DetailsDave Hannah
BLD-Aging Inspection3/6/20083/6/20083/6/2008 PASS
DetailsDave Hannah
BLD-Final4/20/20074/20/20074/20/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/19/2007 at 9:48:11 PM. Contact: ###-####. ok for tem occ ok for perm after others go perm
BLD-Final4/19/20074/20/20074/20/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/19/2007 at 9:48:11 PM. Contact: ###-####.
FIRE-Final Inspection4/19/20074/20/20074/20/2007APART
DetailsForrest France
Final pending completion and final of the building fire alarm and sprinkler upgrade permits.
FIRE-Final Inspection4/13/20074/16/20074/16/2007AFAIL
DetailsForrest France
Missing required signage at the main entry/exit, one emergency light is not yet installed, need to verifiy adjacent exit discharge light will cover the back exterior exit way sufficiently, provide 2nd pc. canopies for two FS pendednts and remove plastic travel cap on one head in the storage room.
BLD-Final4/13/20074/16/20074/16/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/13/2007 at 1:27:35 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 16 2007 7:42AM.
BLD-Framing/Rough-in9/28/20069/29/20069/29/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/28/2006 at 12:02:53 PM. Contact: ###-####. ok to insulate
BLD-Framing/Rough-in9/23/20059/23/20059/26/2005PPART
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover ceiling