Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD05-01476
StatusFinaled
Name DBSI
Site Address 12426 W EXPLORER DR Unit: #100
Project Name 
Customer Number 
ePlanReviewNo
Description
*(DDRS - ADVANTAGE)*(BRIGHTON BUILDING) To remodel an existing 16,555 sq ft first floor office space for a new office tenant. Work to include, selective demolition of nonbearing interior partitions, construction of approximately 160 lf of new interior partitions to create offce spaces, installation of new lighting in these new office areas with dual-level switching, Miscelaneous related finishes. NOTE: This building is fully fire sprinklered any alterations to the sprinkler system WILL require a separate fire sprinkler permit and shall be installed per NFPA #13 as regulated by the fire department. (rmh)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/18/20057/18/20057/18/2005PPASS
DetailsTroy Cobbley
Life safety finaled
Permanent Occupancy 7/18/20057/18/2005 DONE
Details
BLD-Final7/15/20057/15/20057/15/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/15/2005 at 7:53:47 AM. Contact: ###-####. Ok for perm occ when fire has passed.
FIRE-Final Inspection7/15/20057/15/20057/15/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given until three emergency lights have been added as discussed. One goes into the breakroom and two in the east open office
FIRE-Final Inspection7/15/20057/15/20057/15/2005AFAIL
DetailsTroy Cobbley
Final fire sprinkler permit, repair exit signs and emergency lights. Additional devices may be required. I need to verify wether door mags will be an issue.
BLD-Framing/Rough-in7/12/20057/13/20057/13/2005APASS
DetailsJim Sly
###-#### - kevin Note: drop ceiling
grid OK.....asked for spacer bars....look at final.
FIRE-Final Inspection7/12/20057/12/20057/12/2005PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 7/12/2005 at 8:51:51 AM.
kevin Miller made mistake inspection
BLD-Framing/Rough-in6/21/20056/22/20056/22/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/21/2005 at 9:27:15 PM. Contact: ###-####.