BLD-Final | 1/9/2006 | 1/9/2006 | 1/10/2006 | P | PASS |
Jim Sly
|
|
|
darrin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued
|
FIRE-Final Inspection | 1/9/2006 | 1/9/2006 | 1/9/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
DOC - Permit Finaled | 1/10/2006 | 1/9/2006 | 1/9/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | PASS |
Jim Sly
|
|
|
ceiling grid and framing insp//darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 11/23/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Jim Sly
|
|
|
darin Note: also ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Ceiling next to last row of ceiling sections to the East OK
|
BLD-Framing/Rough-in | 11/2/2005 | 11/3/2005 | 11/3/2005 | A | PART |
Jim Sly
|
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Frame OK at gridl 21-22-23
|
BLD-Framing/Rough-in | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | PART |
Jim Sly
|
|
|
also a ceiling grid inspection please////darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Ceiling section C-4 to C-5 North side OK
|
BLD-Framing/Rough-in | 8/1/2005 | 8/2/2005 | 8/2/2005 | A | PART |
Jim Sly
|
|
|
darwin Note: also ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Quads 9 thru 16 as noted on plans OK.
|
BLD-Framing/Rough-in | 7/6/2005 | 7/7/2005 | 7/7/2005 | P | PART |
Jim Sly
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore West 1/4th of Cafeteria OK . Asked Contr to furnish listing for ceiling/grid, Verification that HVAC openings in ceiling are dampered, 1hr rated and operable. Need to "tent" speakers....double layer rock.
|