BLD-Final | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
Permanent Occupancy | | 12/30/2005 | 12/30/2005 | | DONE |
|
|
|
|
BLD-Final | 12/23/2005 | 12/23/2005 | 12/23/2005 | P | PASS |
Forrest France
|
|
|
c/n items are complete, okay for final
|
BLD-Final | 10/24/2005 | 10/25/2005 | 10/25/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 11:25:42 AM. Contact: ###-####. ok for temp occ needs plumb and elec to go final need to install all signage and walk project one more time
|
FIRE-Final Inspection | 10/24/2005 | 10/24/2005 | 10/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm permit needs finaling. Life safety is ok to final when this is done.
|
BLD-Conference | 10/3/2005 | 10/4/2005 | 10/5/2005 | A | DONE |
Dave Hannah
|
|
|
on ceilings on 3rd floor-- dave-- call 1st before insp chris ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 8/15/2005 | 8/16/2005 | 8/17/2005 | A | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to one side still need to look at plumbing pens
|