Permit Information
Permit NumberBLD05-01564
StatusFinaled
Name WEST BOISE FAMILY YMCA
Site Address 5959 N DISCOVERY PL
Project NameWEST BOISE FAMILY YMCA
Customer Number 
ePlanReviewNo
Description
(WEST BOISE FAMILY YMCA - SECOND STORY ADDITION) This building is fire sprinklered for building area increase. Interior nonstructural demolition is covered under permit BLD05-02313. To construct a 2,800 square 2nd story addition within an existing recreational facility. After the addition, the 2nd story will have a floor area of about 21,300 square feet and this building will have a total floor area of about 99,300 square feet. The actual volume of this building remains the same. Work is to include concrete footings, steel columns, steel beams, concrete floor, suspended ceilings, aluminum storefront system, and guards. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. No zoning review required per Scott Spjute, Zoning & Development Mgr. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection6/14/20066/14/20066/14/2006 PASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final5/30/20065/30/20065/30/2006PPASS
DetailsJim Sly
Anna, : ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled5/30/20065/30/20065/30/2006PPASS
DetailsJim Sly
Permanent Occupancy 5/30/20065/30/2006 DONE
Details
BLD-Final12/15/200512/15/200512/15/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/15/2005 at 9:47:10 AM. Contact: ###-####.
OK for Temp Occ. OK to Perm when Fire Perms. ():
FIRE-Final Inspection12/15/200512/15/200512/15/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hannimen's permission until the fire alarm permit is finaled. The exit sign on the second floor at the top of the west stairs needs repaired and the emergency light on the first floor east exit needs repaired.
BLD-Conference12/12/200512/13/200512/13/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2005 at 12:30:09 PM. Contact: ###-####.
Reviewed letter from Architect justifying and approving 12ga wire at 7' 6" supporting cold rolled steel carrying 2nd floor ceiling.
BLD-Framing/Rough-in12/8/200512/9/200512/9/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/8/2005 at 12:44:16 PM. Contact: ###-####.
BLD-Framing/Rough-in12/7/200512/7/200512/7/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/7/2005 at 9:14:48 AM. Contact: ###-####.
need to complete Firestopping at walls above F R ceiling 2nd Flr.
BLD-Framing/Rough-in11/28/200511/28/200511/28/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/28/2005 at 8:34:57 AM. Contact: ###-####.
1st layer (shaft bd) at 1hr wall 2nd floor near ceiling OK OK to install 2nd layer ....(5/8 rock)
BLD-Framing/Rough-in11/22/200511/23/200511/23/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/22/2005 at 3:27:52 PM. Contact: ###-####.
Insp of 1st layer shaft wall 2nd flr.....Need to firestop and re-inspect.
BLD-Framing/Rough-in11/10/200511/14/200511/14/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/10/2005 at 12:53:58 PM. Contact: ###-####.
Need UL design from Arch for N. wall 2nd floor.
BLD-Framing/Rough-in11/2/200511/3/200511/3/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/2/2005 at 3:43:31 PM. Contact: ###-####.
BLD-Conference11/2/200511/2/200511/2/2005PDONE
DetailsJim Sly
per your request Internet Inspection Request from: Letitia Mesa
Talked to Dan about Stamped letters and details fro Architect for any changes made on the approved plan.
BLD-Framing/Rough-in10/27/200510/28/200510/28/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/27/2005 at 10:11:48 AM. Contact: ###-####.
Framing around all beams 1st floor OK
BLD-Framing/Rough-in10/17/200510/18/200510/18/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/17/2005 at 1:38:57 PM. Contact: ###-####.
Framing around small beams to allow for 2 5/8 rock. OK
BLD-Concrete10/11/200510/12/200510/12/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/11/2005 at 11:36:20 AM. Contact: ###-####.
Dan talked with Engineer.....No special insp req at concrete floor deck.
BLD-Conference9/22/20059/22/20059/22/2005PPART
DetailsJim Sly
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need some one to approve modified listed tested assembly for protection of columns..... referred Architect to Plan check and George Slane.
BLD-Footing8/31/20058/31/20058/31/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/31/2005 at 9:28:15 AM. Contact: ###-####. Talked to Dan..... 3000 psi conc Req. special insp.....Or letter from Eng of record to reduce design strength to 2500