Permit Information
Permit NumberBLD05-01577
StatusFinaled
Name RON RAMZA INVESTMENT LLC
Site Address 4125 S GEKELER LN
Project NameGarage Town Ph I, Bldgs 1,2&3
Customer Number 
ePlanReviewNo
Description
Self Storage Buildings * Buildings, #1, #2 & #3 for phase I. To construct three noncombustible self storage buildings for use as private storage units and garages for the storage of motor homes, travel trailers, boats and private vehicles. Building #1 is 16,944 sq.ft. and is separate by a three hour fire barrier wall at grid line 12 to reduce fire area below 12,000 sq.ft. Building, 2 is 9648 sq.ft. and is separated from building 3 with a three hour fire barrier wall to reduce fire area below 12,000 sq.ft. Building 3 is 9,648 sq.ft. Building #1 contains a 576 sq.ft office space with restroom and storage area. All construction per the approved plans and attached comment list. REFER TO BLD 05-01031 for the grading permit. MJP DRH 05-0008
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/9/20065/9/20065/9/2006PPASS
DetailsJim Storey
shane ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
Permanent Occupancy 5/9/20065/9/2006 DONE
Details
BLD-Final3/30/20063/31/20063/31/2006PPART
DetailsJim Sly
Shane -- pending fire life safety insp 3-31 AM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
OK for Temp occ for Blg #1 only. C/N ... Obtain perm occ status within 90 days of this notice. Need all (if any) req final approvals from Special insp agency or Engineer. Need Perm On Plumbing.
FIRE-Final Inspection3/30/20063/31/20063/30/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection3/23/20063/24/20063/24/2006AFAIL
DetailsForrest France
The entrance gates are not installed at this time for verification of required width, functionality, hardware, etc, need to provide an additional building address facing Gekeler street.
BLD-Framing/Rough-in3/20/20063/20/20063/20/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/20/2006 at 9:44:15 AM. Contact: ###-####.
BLD-Framing/Rough-in2/10/20062/13/20062/14/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/10/2006 at 3:10:26 PM. Contact: ###-####.
BLD-Framing/Rough-in2/6/20062/7/20062/7/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/6/2006 at 3:10:36 PM bldg 1. 3 hr ok on ele penatrations need to verify girts and perlin fire stopping at sidewalls and roof. ok to firestop from backside at girts. arch. to supply ul listing for bldg. 2# west end that will work with struc. design.
BLD-Framing/Rough-in1/18/20061/19/20061/19/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/18/2006 at 8:54:15 AM. Contact: ###-####.all but 3 hr fire wall ok need to remove ele pannel form wall and frame to the exterior walls ans roof / putty pads and reinsp required on this wall..
BLD-Aging Inspection1/12/20061/12/20061/12/2006 NR
DetailsJim Storey
no requist for insp.
BLD-Framing/Rough-in11/10/200511/10/200511/10/2005PPART
DetailsJim Storey
freeze wall & rebar -chuck ; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliecovered by si
BLD-Footing11/2/200511/2/200511/2/2005PPASS
DetailsJim Storey
matt - ###-####
BLD-Foundation10/27/200510/31/200510/31/2005APASS
DetailsJim Storey
chuck; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesbldg #2 ok
BLD-Foundation10/19/200510/20/200510/20/2005PPART
DetailsTom Arcoraci
john Note: wall after 12:00; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles partial bld 1 and 3
BLD-Foundation10/18/200510/19/200510/19/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2005 at 2:41:09 PM. bldg.2# center pad ft and walls with peirs ok
BLD-Foundation10/13/200510/14/200510/14/2005APASS
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Frost wall on grid D at bldg #1.
BLD-Footing10/13/200510/14/200510/14/2005APART
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior column pad footings at bldg #1.
BLD-Foundation10/7/200510/10/200510/10/2005APART
DetailsMike Jordan
foundation wall-- john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. bldg. 1 frost wall at grid A from grids 8 to 16. Column pad footings on grid D (8 total) Column pad footings at bldgs. 2 & 3 at end walls.
BLD-Wall cover9/29/20059/30/20059/30/2005PPASS
DetailsJim Storey
john Note: wall aslo; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/29/20059/30/20059/30/2005PPASS
DetailsJim Storey
john Note: wall aslo; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/21/20059/22/20059/22/2005APASS
DetailsJim Storey
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/16/20059/19/20059/19/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 10:32:25 AM.
BLD-Footing9/14/20059/14/20059/14/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/14/2005 at 9:14:43 AM. wip
BLD-Foundation9/9/20059/9/20059/9/2005PPART
DetailsJim Storey
south end 1/3 ok rebar pending si ans sope letter.