BLD-Final | 6/30/2008 | 7/1/2008 | 7/2/2008 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-#### ok for perm c of o
|
BLD-Final | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Tony Young
|
|
|
Dan Phone #: ###-#### temp occ ok,, conf only
|
BLD-Final | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | CANC |
Tony Young
|
|
|
Dan ###-#### Inspection cancelled from web by: Alexandra Rahn
|
BLD-Final | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | PART |
Mike Jordan
|
|
|
Dan Phone #: ###-####. Needs to provide sloping surface at elevation change on sog from garage to mech. room at doorway. Install remainder of smoke seals on rated doors. Noted on approved plans and plan review notes for fairhousing act for kitchen counter heights and sink depth for kitchen sink is non compliant as in installed. Plans call for 34 inch counter heights with knee clearance underneath kitchen sink and 6.5 inch max depth on portion of kitchen sink. Noted to contractor that this needs to be repaired or rebsubmit for drawings from archtiect for approval. Ok for temp occ.
|
FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed.
|
BLD-Aging Inspection | 6/5/2008 | 6/5/2008 | 6/6/2008 | | PASS |
Tony Young
|
|
|
|
BLD-Foundation | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PART |
Tony Young
|
|
|
dan Phone #: ###-#### 2 light pole ftgs
|
BLD-Footing | 3/27/2008 | 3/28/2008 | 3/31/2008 | P | CANC |
Tony Young
|
|
|
dan Phone #: ###-####
|
BLD-Footing | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | FAIL |
Tony Young
|
|
|
dan Phone #: ###-#### 2 light pole ftgs,, not per plan, need ok as built or redo
|
BLD-Other | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | PASS |
Tony Young
|
|
|
dan Note: shear nail Phone #: ###-#### interior ok
|
BLD-Other | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/6/2008 at 6:33:35 PM. Contact: ###-####. 1st layer of rock ok
|
BLD-Wall cover | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PASS |
Tony Young
|
|
|
jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2008 | 2/26/2008 | 2/26/2008 | P | PASS |
Jim Storey
|
|
|
dan Phone #: ###-#### c/n ok meed foire chakling/ ok to insulate.
|
BLD-Framing/Rough-in | 2/21/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Tony Young
|
|
|
dan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2008 | 2/22/2008 | 2/22/2008 | A | NR |
Tony Young
|
|
|
dan Phone #: ###-#### need trades 1st
|
BLD-Aging Inspection | 2/18/2008 | 2/18/2008 | 2/21/2008 | | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/13/2007 | 12/13/2007 | 12/13/2007 | P | PART |
Tony Young
|
|
|
dan Phone #: ###-#### ok to rock walls where furnace is
|
BLD-Framing/Rough-in | 12/5/2007 | 12/6/2007 | 12/6/2007 | A | PART |
Jim Sly
|
|
|
dan Phone #: ###-#### OK to cover select walls in Mech Rm.
|
BLD-Other | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | PASS |
Tony Young
|
|
|
jeremy Note: shear Phone #: ###-#### all ext shear ok
|
BLD-Footing | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PART |
Jim Sly
|
|
|
bill Note: stem walls Phone #: ###-#### Stem walls OK pending MTI special inspection, tests, and approvals. Note: will provide special insp report for footing......next inspection.
|
BLD-Footing | 8/20/2007 | 8/20/2007 | 8/20/2007 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####-9006 pending eng/s. i. report
|