BLD-Final | 7/25/2006 | 7/25/2006 | 7/25/2006 | P | PASS |
Jim Sly
|
|
|
tim opp - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley C/C issued
|
DOC - Permit Finaled | 7/25/2006 | 7/25/2006 | 7/25/2006 | P | PASS |
Jim Sly
|
|
|
|
Code Occupancy Approval | 7/24/2006 | 7/24/2006 | 7/24/2006 | A | PASS |
Carol Montgomery
|
|
|
Meets compliance with DRH05-00097 - Signed Final (7-21-2006)
|
FIRE-Final Inspection | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Conference | 6/21/2006 | 6/22/2006 | 6/22/2006 | P | DONE |
Troy Cobbley
|
|
|
I went over the life safety comments with the contractor
|
BLD-Framing/Rough-in | 11/9/2005 | 11/10/2005 | 11/10/2005 | A | CANC |
Jim Sly
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 11/7/2005 | 11/8/2005 | 11/8/2005 | P | PART |
Mike Jordan
|
|
|
tim opp; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Steelstuds at storefront on bldg A.
|
BLD-Framing/Rough-in | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | PART |
Jim Sly
|
|
|
tim Note: steelhead framing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 10/28/2005 | 11/1/2005 | 11/1/2005 | P | CANC |
Jim Sly
|
|
|
joe Note: underground r/i; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 10/28/2005 | 10/31/2005 | 10/31/2005 | P | PART |
Mike Jordan
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Bldg. A trusses and roog sheeting. Contractor to get RFI from engineer for deletion of hangars on blocking and straps at east end of roof.
|
BLD-Other | 10/19/2005 | 10/20/2005 | 10/20/2005 | P | DEFR |
Mike Jordan
|
|
|
kim Note: structural masonery walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Contractor is receiving special insp.
|
BLD-Other | 10/19/2005 | 10/19/2005 | 10/19/2005 | P | PART |
Mike Jordan
|
|
|
kim Note: structural masonery walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 10/12/2005 | 10/14/2005 | 10/14/2005 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/12/2005 at 6:45:21 PM. Contact: ###-####. Masonry insp. Contractor is getting special insp.
|
BLD-Other | 10/12/2005 | 10/13/2005 | 10/13/2005 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/12/2005 at 6:44:21 PM. Contact: ###-####. Masonry inspection. Reinforcement above lintels has been repaired and verified by special inspector.
|
BLD-Other | 10/11/2005 | 10/12/2005 | 10/12/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/11/2005 at 11:51:37 AM. Inadequate reinforcement over lintels on north wall. Not per approved plans. Special inspector to verify repair.
|
BLD-Foundation | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | PASS |
Jim Sly
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 9/2/2005 | 9/6/2005 | 9/6/2005 | P | PASS |
Mike Jordan
|
|
|
larry black ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. (next door to D.I.) footing ok. no special inspection required for conc. Will be required for masonry and welding.
|