BLD-Final | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PASS |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Final OK........C/C issued.
|
DOC - Permit Finaled | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | CANC |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Final | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | CANC |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Final | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | NR |
Jim Sly
|
|
|
Pat, late afternoon if possible = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Verify if P/W wants to final.
|
FIRE-Final Inspection | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety already finaled on the 16th
|
FIRE-Final Inspection | 11/16/2006 | 11/16/2006 | 11/16/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 10/31/2006 | 11/3/2006 | 11/2/2006 | P | CANC |
Jim Sly
|
|
|
pat - ###-#### Inspection cancelled from web by: Cathy Weisshaupt
|
FIRE-Final Inspection | 10/31/2006 | 11/3/2006 | 11/2/2006 | P | CANC |
Troy Cobbley
|
|
|
pat - ###-#### Inspection cancelled from web by: Cathy Weisshaupt
|
FIRE-Final Inspection | 10/2/2006 | 10/3/2006 | 10/4/2006 | A | FAIL |
Troy Cobbley
|
|
|
The plans need to be resubmitted since the fire dept. access roadway has changed significantly. All other items appear ok.
|
BLD-Final | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | NR |
Jim Sly
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 3:36:56 PM. CMU walls Special insp req
|
BLD-Other | 5/31/2006 | 6/1/2006 | 6/1/2006 | P | PASS |
Jim Sly
|
|
|
tab Note: elevate roof slab; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Last pour.........OK pending special inspection.......reports and approvals, and approval by Structural Engineer of record.
|
BLD-Final | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | PART |
Jim Sly
|
|
|
PAT; Phone #: ###-#### Internet Inspection Request from: Darla Downs Last pour on large tank walls......OK pending special insp by Rick Cummings and MTI tests and approvals.
|
BLD-Concrete | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Jim Sly
|
|
|
pat Note: reinforcement ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Utilidor Slabs OK pend MTI special insp tests and approvals.
|
BLD-Foundation | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PART |
Jim Sly
|
|
|
Pat\\ will pour in the pm on 4-20-06; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung S. E. corner....Wall insp. OK Pending special insp by Rick Cummings and MTI inspection, tests and approvals.
|
BLD-Framing/Rough-in | 4/10/2006 | 4/11/2006 | 4/11/2006 | A | PART |
Jim Sly
|
|
|
Pat -- concrete walls; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong North wall and Remainder of E wall.....OK pending MTI special insp tests and approvals
|
BLD-Framing/Rough-in | 3/24/2006 | 3/27/2006 | 3/27/2006 | A | PART |
Jim Sly
|
|
|
Pat -- concrete wall inspection; pouring at 12:00; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Tall wall at West Tank Completion of North wall ....and N. W. 1/2 of West wall. Pending special insp, tests and approvals.
|
BLD-Framing/Rough-in | 3/13/2006 | 3/15/2006 | 3/15/2006 | A | PART |
Jim Sly
|
|
|
Pat -- wall concrete placement for filtrate tanks; pouring concrete at noon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Center section of South wall includes "T" section measuring 15'x15'x15'. 4000lb psi concrete required. Test results on previously poured sections at 7 day coming in at around 5800psi.
|
BLD-Framing/Rough-in | 3/6/2006 | 3/8/2006 | 3/8/2006 | A | PART |
Jim Sly
|
|
|
Pat -- for filtrate tank first wall pore; pouring at 10 AM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong partial section of 20' high wall.
|
BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PART |
Jim Sly
|
|
|
Pat -- will be pouring at noon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Pouring footing at SW and SE section of Bldg..........Special inspection by Rick Cummings and MTI.
|
BLD-Aging Inspection | 2/13/2006 | 2/13/2006 | 2/21/2006 | | DONE |
Jim Sly
|
|
|
WIP
|