Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01768
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC8537
ePlanReviewNo
Description
Micron Building #2 and #3 - Fab 1A Remodel Mechanical Room for XT1400 Scanner Support Equipment - To demo and remove a 4 riser stair, remove a section of lockers, install a 6'x7' door at the east wall of locker room 200G. To construct 39 lineal feet of steel stud partitions and a new 3'x7' door and acoustical suspended ceiling to create a new 180 square foot equipment mechanical room to support the installation of the new XT1400 Scanner. This permit also includes the construction of two 8 foot steel platforms for the equipment. This work is being done at the second floor of Building #2 between grid lines 11 & 12 and C & D. To remove some existing fabrication equipment and install new XT1400 scanner equipment and to reconfigure some of the existing equipment in this area. This equipment reconfiguration is being done on the first floor of Building #2, in Photo Bay 9, between grid lines 10 & 11 and B & D. There is no building modification except removal of some floor tiles and pedestals for the new equipment. This permit is being used to attach associated electrical and mechanical permits. Building #3 - To an equipment swap at Photo Bay "E" on the first floor of Building #3 between grid lines 9 & 10 and F & G. There is no building modification this permit is being used to attach associated electrical and mechanical permits. A stocker is being removed from Stocker Room #107 and new ceiling Hepa Filters are being installed at that location. This being done on the first floor of Building #3 between grids 10 & 11 and C & D. Building #2 is an F1 Occupancy and Building #3 is an H5 Occupancy. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/15/20059/16/20059/16/2005APASS
DetailsJim Storey
l/c ok isued on site.
DOC - Permit Finaled9/16/20059/16/20059/16/2005PPASS
DetailsJim Storey
BLD-Final9/15/20059/15/20059/15/2005PCANC
DetailsJim Storey
Jim everything should be finaled and ready for your final....; Phone #: ###-#### Internet Inspection Request from: Wayne Berry
FIRE-Final Inspection9/12/20059/13/20059/13/2005APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection9/7/20059/8/20059/7/2005ACANC
DetailsForrest France
Phone #: ###-#### Internet Inspection Request from: Wayne Berry Inspection cancelled from web by: Wayne Berry
BLD-Conference8/8/20058/9/20058/9/2005APASS
DetailsJim Storey
ceilling ok
BLD-Conference8/8/20058/8/20058/8/2005PDEFR
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry