BLD-Final | 5/18/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/18/2006 at 10:40:55 AM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | FAIL |
Mike Jordan
|
|
|
larry; Phone #: ###-#### Note: call code Internet Inspection Request from: Cathy Chiles. Needs 20 min. door from R to U occ. window above tub needs to be safety glazed.
|
BLD-Energy code compliance | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PASS |
Jim Sly
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PASS |
Jim Sly
|
|
|
Larry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|