BLD-Final | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/30/2005 at 11:36:57 AM. Contact: ###-####. Ceiling has been fixed. Ok for perm occ.
|
Permanent Occupancy | | 12/1/2005 | 12/1/2005 | | DONE |
|
|
|
|
BLD-Final | 11/28/2005 | 11/29/2005 | 11/29/2005 | A | FAIL |
Mike Jordan
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp occ given. Noted suspended ceiling system is riveted for floating system. Rivets to be removed and spreader bars installed.
|
BLD-Final | 11/25/2005 | 11/28/2005 | 11/28/2005 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/25/2005 at 2:02:59 PM. Contact: ###-####. Need to final shell and core first.
|
FIRE-Final Inspection | 11/25/2005 | 11/28/2005 | 11/28/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 11/23/2005 | 11/25/2005 | 11/25/2005 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/23/2005 at 3:29:12 PM. Contact: ###-####.
|
FIRE-Final Inspection | 11/23/2005 | 11/25/2005 | 11/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
Need to provide the correct remote annunciators for the duct smoke detectors and then test duct smoke detectors. Also need building address installed facing Overland and provide the correct "Maximum Occupancy Load" sign for the assembly area.
|
FIRE-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | CANC |
Troy Cobbley
|
|
|
No time for inspection
|
BLD-Framing/Rough-in | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | PART |
Jim Storey
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moorewalls ok
|