BLD-Final | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PASS |
Dave Hannah
|
|
|
jerry -re-insp -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
|
BLD-Final | 3/21/2006 | 3/21/2006 | 3/21/2006 | P | PART |
Dave Hannah
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ
|
FIRE-Final Inspection | 3/20/2006 | 3/21/2006 | 3/21/2006 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, fire life safety inspection is satisfactory.
|
FIRE-Final Inspection | 3/17/2006 | 3/20/2006 | 3/20/2006 | A | FAIL |
Forrest France
|
|
|
The project related hood and sprinkler permits must be finaled prior to life safety final, storage shelves that extend underneath the cooking hood canopy must be removed, provide max occupant load sign for the dining area, remove keyed locking hardware at the NE door, provide signage at the door to be used as the main entry/exit.
|
BLD-Framing/Rough-in | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Dave Hannah
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong headers and flr framing for hood venting need letter from engineer oking changes
|
BLD-Framing/Rough-in | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Dave Hannah
|
|
|
Jerry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 12/1/2005 | 12/2/2005 | 12/2/2005 | A | DONE |
Dave Hannah
|
|
|
jr; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|