Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-02015
StatusFinaled
Name CM COMPANY
Site Address 2601 N BOGUS BASIN RD
Project NameHEALTHWISE
Customer Number
ePlanReviewNo
Description
Healthwise Building Addition - To construct a new 16,754 sq. ft. three story type II-A office addition to an existing three story office building. Other work includes all site improvements, paving, landscaping, demolition, trash enclosure and motorcycle cover per approved plans and attachments, DRH05-00066, CUP05-00014 and CFH05-00008. This building is fully fire sprinklered with sprinklers used for 1 hour substitution. (mlo)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/200612/1/200612/1/2006APASS
DetailsTony Young
ross ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
ok for perm c of o
BLD-Final10/12/200610/13/200610/13/2006PPART
DetailsTony Young
ross - note: structrual and code enforcement ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
ok for temp. occ. pending code enforcement
FIRE-Final Inspection10/12/200610/13/200610/13/2006APASS
DetailsForrest France
Corrections have been verified, fire life safety inspection passed. Note, one section of curb missing fire lane paint marking to be completed per contractor, will verify next week for compliance.
BLD-Grading Inspection10/13/200610/13/200610/13/2006 DONE
final Grading and drainage approved
FIRE-Final Inspection10/11/200610/12/200610/12/2006PNR
DetailsForrest France
Still need alarm and sprinkler trade permits signed off before life safety final.
FIRE-Final Inspection10/10/200610/11/200610/11/2006PCANC
DetailsTroy Cobbley
No time for inspection due to time constraints and micron plan review
FIRE-Final Inspection10/9/200610/10/200610/10/2006AFAIL
DetailsTroy Cobbley
No fire life safety inspection was performed since the fire sprinklers and the fire alarm permit are not finaled yet.
BLD-Final10/6/200610/9/200610/9/2006PNR
DetailsTony Young
ross; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection10/6/200610/9/200610/9/2006PFAIL
DetailsForrest France
The project related alarm and sprinkler permit work must be approved and finaled prior to BLD life safety final. Note: two alarm permits are attatched to this project.
FIRE-Final Inspection10/4/200610/6/200610/6/2006PCANC
DetailsTroy Cobbley
No time left in day for inspection
BLD-Final10/5/200610/6/200610/6/2006PNR
DetailsTony Young
ross - note: after 3:30 pm ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Conference9/29/200610/4/200610/4/2006ADONE
DetailsDave Hannah
ross; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Concrete9/19/20069/20/20069/20/2006APART
DetailsTony Young
ross; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
pending s. i. report
BLD-Other8/15/20068/16/20068/16/2006APART
DetailsDave Hannah
russ Note: grid ceiling 3rd floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover 3rd floor ceiling after elec oks
BLD-Framing/Rough-in8/11/20068/11/20068/11/2006PPART
DetailsTony Young
ross - rebar insp (placement at 10:30); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
area #2 and #6 ok
BLD-Framing/Rough-in8/8/20068/9/20068/9/2006APART
DetailsTony Young
above the ceiling insp - lisa or cell ###-#### ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok pending trades
BLD-Framing/Rough-in6/22/20066/23/20066/23/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/22/2006 at 1:36:52 PM. Contact: ###-####.
remainder of 3rd floor ok
BLD-Framing/Rough-in6/7/20066/7/20066/7/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/7/2006 at 6:50:27 AM. Contact: ###-####.
north side of 3rd floor ok pending
BLD-Framing/Rough-in6/1/20066/2/20066/2/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/1/2006 at 2:23:09 PM. Contact: ###-####.
main level walls ok pending trades
BLD-Framing/Rough-in5/26/20065/26/20065/26/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/26/2006 at 9:25:04 AM. Contact: ###-####.
2nd floor walls ok to cover
BLD-Wall cover4/28/20065/1/20065/1/2006APASS
DetailsTony Young
drywall on exterior; Phone #: ###-####
BLD-Wall cover4/27/20064/28/20064/28/2006ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 4/27/2006 at 11:26:50 AM. Contact: ###-####.
rescheduled for monday am
BLD-Conference4/21/20064/21/20064/21/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/21/2006 at 7:32:31 AM. Contact: ###-####. Need tech data on Hilti fire rated foam for application used on the 1 hr. floor ceiling assembly.
BLD-Framing/Rough-in4/11/20064/12/20064/12/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/11/2006 at 1:05:31 PM. Contact: ###-####. Performed walk thru with general contractor and discussed general items regarding the floor ceiling assemblies, egress stairway. wip. Noted that steel beams are being wrapped with double layer 1/2'' rock and being capped with 5/8 type X as per details. Also reveiwed UL listing requirements for rated penetrations.
BLD-Concrete1/18/20061/19/20061/19/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/18/2006 at 7:32:21 AM. Contact: ###-####.
upper ftg,, s.i . will be on site
BLD-Concrete1/18/20061/18/20061/18/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/18/2006 at 7:31:27 AM. Contact: ###-####. Welded wire mesh for interior slab on grade. wip.
BLD-Concrete1/5/20061/6/20061/6/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/5/2006 at 2:28:07 PM. Contact: ###-####.
wip,, s. i. on site
BLD-Concrete12/29/200512/29/200512/29/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/29/2005 at 9:26:26 AM. Contact: ###-####. NW wall. Only one mat tied. Special inspector to inspect when complete.
BLD-Footing12/16/200512/19/200512/19/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/16/2005 at 9:46:22 AM. Contact: ###-####.
ok pending s. i. report
BLD-Concrete12/6/200512/7/200512/7/2005APART
DetailsTony Young
ross; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pending s. i. report
BLD-Footing11/30/200512/1/200512/1/2005ACANC
DetailsTony Young
ross tucker; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
canc. due to snow
BLD-Footing11/21/200511/22/200511/22/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/21/2005 at 4:36:25 PM. Contact: ###-####.
stair area ok,, from steet/parking lot area
BLD-Footing11/18/200511/21/200511/21/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/18/2005 at 1:35:38 PM. Contact: ###-####.
retaining wall ftgs,, 5ftw 12"deep,, pending s. i. report