BLD-Final | 11/29/2006 | 12/1/2006 | 12/1/2006 | A | PASS |
Tony Young
|
|
|
ross ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for perm c of o
|
BLD-Final | 10/12/2006 | 10/13/2006 | 10/13/2006 | P | PART |
Tony Young
|
|
|
ross - note: structrual and code enforcement ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp. occ. pending code enforcement
|
FIRE-Final Inspection | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | PASS |
Forrest France
|
|
|
Corrections have been verified, fire life safety inspection passed. Note, one section of curb missing fire lane paint marking to be completed per contractor, will verify next week for compliance.
|
BLD-Grading Inspection | 10/13/2006 | 10/13/2006 | 10/13/2006 | | DONE |
|
|
|
final Grading and drainage approved
|
FIRE-Final Inspection | 10/11/2006 | 10/12/2006 | 10/12/2006 | P | NR |
Forrest France
|
|
|
Still need alarm and sprinkler trade permits signed off before life safety final.
|
FIRE-Final Inspection | 10/10/2006 | 10/11/2006 | 10/11/2006 | P | CANC |
Troy Cobbley
|
|
|
No time for inspection due to time constraints and micron plan review
|
FIRE-Final Inspection | 10/9/2006 | 10/10/2006 | 10/10/2006 | A | FAIL |
Troy Cobbley
|
|
|
No fire life safety inspection was performed since the fire sprinklers and the fire alarm permit are not finaled yet.
|
BLD-Final | 10/6/2006 | 10/9/2006 | 10/9/2006 | P | NR |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
FIRE-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 | P | FAIL |
Forrest France
|
|
|
The project related alarm and sprinkler permit work must be approved and finaled prior to BLD life safety final. Note: two alarm permits are attatched to this project.
|
FIRE-Final Inspection | 10/4/2006 | 10/6/2006 | 10/6/2006 | P | CANC |
Troy Cobbley
|
|
|
No time left in day for inspection
|
BLD-Final | 10/5/2006 | 10/6/2006 | 10/6/2006 | P | NR |
Tony Young
|
|
|
ross - note: after 3:30 pm ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Conference | 9/29/2006 | 10/4/2006 | 10/4/2006 | A | DONE |
Dave Hannah
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Concrete | 9/19/2006 | 9/20/2006 | 9/20/2006 | A | PART |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pending s. i. report
|
BLD-Other | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PART |
Dave Hannah
|
|
|
russ Note: grid ceiling 3rd floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover 3rd floor ceiling after elec oks
|
BLD-Framing/Rough-in | 8/11/2006 | 8/11/2006 | 8/11/2006 | P | PART |
Tony Young
|
|
|
ross - rebar insp (placement at 10:30); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley area #2 and #6 ok
|
BLD-Framing/Rough-in | 8/8/2006 | 8/9/2006 | 8/9/2006 | A | PART |
Tony Young
|
|
|
above the ceiling insp - lisa or cell ###-#### ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok pending trades
|
BLD-Framing/Rough-in | 6/22/2006 | 6/23/2006 | 6/23/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/22/2006 at 1:36:52 PM. Contact: ###-####. remainder of 3rd floor ok
|
BLD-Framing/Rough-in | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 6:50:27 AM. Contact: ###-####. north side of 3rd floor ok pending
|
BLD-Framing/Rough-in | 6/1/2006 | 6/2/2006 | 6/2/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/1/2006 at 2:23:09 PM. Contact: ###-####. main level walls ok pending trades
|
BLD-Framing/Rough-in | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 9:25:04 AM. Contact: ###-####. 2nd floor walls ok to cover
|
BLD-Wall cover | 4/28/2006 | 5/1/2006 | 5/1/2006 | A | PASS |
Tony Young
|
|
|
drywall on exterior; Phone #: ###-####
|
BLD-Wall cover | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/27/2006 at 11:26:50 AM. Contact: ###-####. rescheduled for monday am
|
BLD-Conference | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/21/2006 at 7:32:31 AM. Contact: ###-####. Need tech data on Hilti fire rated foam for application used on the 1 hr. floor ceiling assembly.
|
BLD-Framing/Rough-in | 4/11/2006 | 4/12/2006 | 4/12/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 1:05:31 PM. Contact: ###-####. Performed walk thru with general contractor and discussed general items regarding the floor ceiling assemblies, egress stairway. wip. Noted that steel beams are being wrapped with double layer 1/2'' rock and being capped with 5/8 type X as per details. Also reveiwed UL listing requirements for rated penetrations.
|
BLD-Concrete | 1/18/2006 | 1/19/2006 | 1/19/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 7:32:21 AM. Contact: ###-####. upper ftg,, s.i . will be on site
|
BLD-Concrete | 1/18/2006 | 1/18/2006 | 1/18/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 7:31:27 AM. Contact: ###-####. Welded wire mesh for interior slab on grade. wip.
|
BLD-Concrete | 1/5/2006 | 1/6/2006 | 1/6/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/5/2006 at 2:28:07 PM. Contact: ###-####. wip,, s. i. on site
|
BLD-Concrete | 12/29/2005 | 12/29/2005 | 12/29/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 9:26:26 AM. Contact: ###-####. NW wall. Only one mat tied. Special inspector to inspect when complete.
|
BLD-Footing | 12/16/2005 | 12/19/2005 | 12/19/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/16/2005 at 9:46:22 AM. Contact: ###-####. ok pending s. i. report
|
BLD-Concrete | 12/6/2005 | 12/7/2005 | 12/7/2005 | A | PART |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Barbara Moore pending s. i. report
|
BLD-Footing | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | CANC |
Tony Young
|
|
|
ross tucker; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa canc. due to snow
|
BLD-Footing | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 4:36:25 PM. Contact: ###-####. stair area ok,, from steet/parking lot area
|
BLD-Footing | 11/18/2005 | 11/21/2005 | 11/21/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/18/2005 at 1:35:38 PM. Contact: ###-####. retaining wall ftgs,, 5ftw 12"deep,, pending s. i. report
|