BLD-Aging Inspection | 5/17/2006 | 5/17/2006 | 5/17/2006 | | PASS |
Troy Cobbley
|
|
|
Fire alarm permit has been finaled. This permit ok for perm occupancy
|
DOC - Permit Finaled | 5/17/2006 | 5/17/2006 | 5/17/2006 | A | PASS |
Mike Jordan
|
|
|
Fire alarm has been finaled off on the MIS permit. C/O has been issued for the vanilla finish.
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire alarm plans have been approved and inspected. Also a MIS permit will be required for the new tenant.
|
FIRE-Final Inspection | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm modifications are required as per review comment #18, need to test exit lights and emergency lights
|
BLD-Other | 11/29/2005 | 11/30/2005 | 11/30/2005 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/29/2005 at 2:01:31 PM. Contact: ###-####. ceiling grid.
|
BLD-Conference | 11/29/2005 | 11/30/2005 | 11/30/2005 | A | DONE |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/29/2005 at 2:00:53 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/29/2005 | 9/30/2005 | 9/30/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/29/2005 at 4:01:12 PM. Contact: ###-####.
|