FIRE-Final Inspection | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 8/31/2006 | 9/1/2006 | 9/1/2006 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Walling. Temp occ given. Will be ok for perm occ once lise/safety and fire sprinkler has been finaled.
|
FIRE-Final Inspection | 9/1/2006 | 9/1/2006 | 9/1/2006 | P | PART |
Forrest France
|
|
|
Final pending provision for correct sprinkler coverage at the level of exit discharge at two stairways.
|
Permanent Occupancy | | 9/1/2006 | 9/1/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | FAIL |
Troy Cobbley
|
|
|
Life safety ok to final when fire alarm and fire sprinkler permits are finaled.
|
BLD-Other | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PASS |
Tom Arcoraci
|
|
|
High-Piled storage rack mounting inspection; Phone #: ###-#### Internet Inspection Request from: Mike Walling bolts ok
|
FIRE-Conference | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | DONE |
Troy Cobbley
|
|
|
I went over the life safety items with Mike.
|
BLD-Energy code compliance | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/17/2006 at 11:49:48 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/7/2006 | 7/11/2006 | 7/11/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Walling. Interior framing.
|
BLD-Conference | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PART |
Mike Jordan
|
|
|
Framing/Structural Inspection; Phone #: ###-#### Internet Inspection Request from: Mike Walling. Reviewed special insp. reports, and inspected partial framing at future elev. shaft.
|
BLD-Other | 5/17/2006 | 5/18/2006 | 5/18/2006 | P | DEFR |
Mike Jordan
|
|
|
###-#### - mike Note: welding
|
BLD-Aging Inspection | 5/17/2006 | 5/17/2006 | 5/17/2006 | | PASS |
Mike Jordan
|
|
|
wip
|
BLD-Concrete | 3/10/2006 | 3/13/2006 | 3/13/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/10/2006 at 8:14:13 AM. Contact: ###-####. Reinforcement for tilt panels. Also verified that missing bar from last inspection was installed per special inspection report.
|
BLD-Concrete | 2/20/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/20/2006 at 3:26:52 PM. Contact: ###-####. Tilt panels. Noted missing rebar on t hree panels. Special inspector to verify install of missing bar.
|
BLD-Footing | 1/27/2006 | 1/30/2006 | 1/30/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/27/2006 at 3:23:37 PM. Contact: ###-####. east and south footings.
|
BLD-Footing | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | PASS |
Mike Jordan
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Interior column pad footings. Contractor is getting special inspections.
|