BLD-Final | 9/25/2006 | 9/25/2006 | 9/25/2006 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Simpson
|
DOC - Permit Finaled | 9/25/2006 | 9/25/2006 | 9/25/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/12/2006 | 9/13/2006 | 9/13/2006 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Simpson
|
Code Occupancy Approval | | | 9/7/2006 | | PASS |
|
|
|
ok
|
BLD-Framing/Rough-in | 4/20/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson. Allframing and fireblocking issues have been resolved. ok to cover.
|
BLD-Energy code compliance | 4/20/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson
|
BLD-Framing/Rough-in | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | NR |
Mike Jordan
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. work still needs to be completed at mech. chase.
|
BLD-Framing/Rough-in | 4/17/2006 | 4/18/2006 | 4/18/2006 | A | FAIL |
Jim Sly
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong C/N posted Victory Wb of 5 mi L Canonero.......L on.......
|
BLD-Framing/Rough-in | 4/14/2006 | 4/14/2006 | 4/14/2006 | P | PART |
Mike Jordan
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All items on c/n have been resolved, except for engineering on floor joist with plumbing penetration. ok to insul.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | FAIL |
Mike Jordan
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All repairs not complete.
|
BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | CANC |
Mike Jordan
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Mike Jordan
|
|
|
###-#### - brian. 1.- Provide engineering for repaired open web joists and for floor joist with plumbing penetrations. 2.- Add additional studs under 2 ply AG truss. 3.- Install header over bathroom enterance upstairs. Provide 5/8 type X rock on either side of ML beams as per approved architects letter. 5.- Provide approved insulation betwwen 1 hr. firewalls for required fireblock. 6.- Complete 5/8 type X rock at 1hr wall at rear of house. Provide approved plans and truss engineering. Do not cover.
|
BLD-Footing | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | PASS |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|