BLD-Final | 7/15/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Dave Hannah
|
|
|
Per your request can we final?
|
FIRE-Final Inspection | 7/15/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled, noted correction items are finished.
|
BLD-Aging Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | | PASS |
Dave Hannah
|
|
|
ok to ext
|
BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 | A | PART |
Dave Hannah
|
|
|
Barb----Forrest/Dave this was given temp on 6-21-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 6-21-07. Please let me know...thanks Phone #: ###-####
|
FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/13/2008 | A | FAIL |
Forrest France
|
|
|
Building renovation is not complete, still need project related shell fire sprinkler and alarm permit finals prior to permanent occupancy certificate.
|
BLD-Aging Inspection | 3/10/2008 | 3/10/2008 | 3/10/2008 | | PASS |
Dave Hannah
|
|
|
ok to ext temp occ
|
BLD-Final | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PART |
Dave Hannah
|
|
|
dan Phone #: ###-#### ok for temp occ
|
BLD-Final | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | FAIL |
Dave Hannah
|
|
|
needs mec final
|
BLD-Final | 6/19/2007 | 6/19/2007 | 6/19/2007 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/19/2007 at 9:22:04 AM. Contact: ###-####. needs mec final
|
BLD-Final | 6/15/2007 | 6/18/2007 | 6/18/2007 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2007 at 3:59:52 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/15/2007 | 6/18/2007 | 6/18/2007 | P | PART |
Forrest France
|
|
|
c/n items are complete, fire sprinkler and fire alarm work are not ready for final at this time due to incompleted shell work in progress, per review notes tenant is okay for temp. occupancy until building rennovation is finished.
|
BLD-Final | 6/14/2007 | 6/15/2007 | 6/15/2007 | P | NR |
Dave Hannah
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire finals
|
FIRE-Final Inspection | 6/14/2007 | 6/15/2007 | 6/15/2007 | A | FAIL |
Forrest France
|
|
|
Need to final project related hood suppression permit, fire sprinkler work is not complete, fire alarm needs reprogramming, post max. occupant load sign, attatch provided PFE's to the wall as discussed, need signage above the exit door with keyed locking hardware.
|
BLD-Other | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PART |
Dave Hannah
|
|
|
dan Note: coverup; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover upper ceiling
|
BLD-Framing/Rough-in | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PASS |
Dave Hannah
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Aging Inspection | 1/11/2006 | 1/11/2006 | 1/13/2006 | | PASS |
Dave Hannah
|
|
|
|