Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02196
StatusFinaled
Name ANCHOR BLUE
Site Address 350 N MILWAUKEE ST Unit: 2002
Project NameBTS - #2002
Customer Number 
ePlanReviewNo
Description
(ANCHOR BLUE)(BOISE TOWNE SQUARE-SPACE 2002) To remodel a 4,345 sq.ft. retail space for a new tenant per approved plans. Work to include, selective demolition of interior nonbearing partitions, construction of new interior noncombustible partitions to create two new accessible restrooms, fitting rooms, stock room, retail sales area and exit access corridor, installation of a new 90 minute door assembly into an existing two- hour fire rated stair enclosure, installation of a new storefront system. Installation of new lighting and Hvac systems. Installation of new stroage racks per engineering. This building is fully fire sprinklered any alterations to the sprinkler system WILL require a separate permit and shall be installed per NFPA #13 as regulated by the fire department. This building contains a smoke evacuation system that shall be maintained as originally installed under the 1985 UBC. Rmh (Separate storefront demolition issued under BLD05-02639.) (There will be a separate permit for remaining space behind store)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/10/20061/10/20061/10/2006PPASS
DetailsMike Jordan
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ok for perm occ. New doors installed with automatic flush bolts and indicator.
Permanent Occupancy 1/10/20061/10/2006 DONE
Details
BLD-Final11/7/200511/7/200511/7/2005PPEND
DetailsMike Jordan
Temp occ given. Needs final from mech. Also needs to install code compliant locks on doors. Contractor has ordered new doors. Existing doors have been approved gor use by G. Slane as long as doors are able to be locked in an open position while store is open for bussiness. Temporary latches have been installed in the floor allowing the door to be locked in the open position.
BLD-Final11/1/200511/3/200511/3/2005PFAIL
DetailsMike Jordan
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Incorrect locking mechanism on paired egress doors.
FIRE-Final Inspection11/1/200511/3/200511/3/2005APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection11/2/200511/2/200511/2/2005PFAIL
DetailsTroy Cobbley
robert; Phone #: ###-####
The only life safety items ready to look at was the smoke control and the duct smoke detectors of which both passed. Exit signs to and in the rear corridor did not work. Needs an additional fire extinguisher.
BLD-Framing/Rough-in10/11/200510/11/200510/11/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/11/2005 at 7:06:21 AM. Contact: ###-####.coridor ok for cover as well as west fur out wall.1 hr
BLD-Framing/Rough-in10/6/200510/7/200510/7/2005APART
DetailsJim Sly
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Partial framing ...storefront, restrooms, corridor, partition walls OK. Discussed issues with framer about continuity of 1hr fire partition walls between tenants. Have not framed wall between existing 2hr stair tower and new 1hr corridor.....This will cause a problem with transition from 2hr to 1hr rating.....Need continuous membrane in these areas for rating.... Need to call for inspections as needed and not cover areas effected until we inspect them. Need to verify existing Fire partition walls are fire stopped floor to roof deck.
BLD-Framing/Rough-in10/5/200510/6/200510/6/2005PDEFR
DetailsJim Storey
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time rolled to am.