Permit NumberBLD05-02204
StatusFinaled
Name CITYSIDE LOFTS LLC
Site Address 412 S 13TH ST
Project NamePlaza Mixed Use-Residential
Customer Number 
ePlanReviewNo
Description
Plaza Mixed Used - (Section 1 of 2) A two hour fire wall (also used as a horizontal exit) will be constructed to divide this 42 unit, 61,812 sq.ft. 5 story, wood framed apartment building into two separate buildings, above a Type I-A parking garage, per City Ordinance 4-16. This portion of the building contains 25 units, and is 36,048 which 1,281 sq. ft. is occupied roof area. There are two of these units that are less than 800 sq.ft. each. Refer to BLD 05-02750 for the other side of the fire wall. Refer to BLD 05-00926 for for the parking garage. Refer to BLD 06-00693 for the north building. NOTE: This building is fully fire sprinklered per NFPA 13 per Boise City Ordinance. All construction per the approved plans and attached comment list. MJP DRH 04-00241 CUP 04-00087.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/10/20078/10/20078/13/2007PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Final8/13/20078/13/20078/13/2007PPASS
DetailsDave Hannah
ok for perm occ
BLD-Final8/2/20078/2/20078/7/2007PNR
DetailsDave Hannah
FIRE-Final Inspection8/2/20078/2/20078/2/2007PFAIL
DetailsForrest France
Final pending project related fire alarm permit FIR07-00627 inspection request, approval and final.
BLD-Final7/19/20077/20/20077/20/2007ANR
DetailsDave Hannah
daryl Phone #: ###-####need fire doors at horz exit fixed and stand pipe issue resolved and ok from fire on alarms and spinklers
Code Occupancy Approval  7/19/2007 DONE
BLD-Final5/2/20075/2/20075/4/2007PPART
DetailsDave Hannah
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith went over items on c/n
BLD-Final5/4/20075/4/20075/4/2007APART
DetailsDave Hannah
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Final5/1/20075/1/20075/1/2007PPART
DetailsDave Hannah
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ
FIRE-Final Inspection5/1/20075/1/20075/1/2007PFAIL
DetailsForrest France
Still missing approved door hardware at the main entry/exit first floor, building address numbers are installed too low, the project related fire alarm permit is not ready for final, plastic covers are still in place at the unit single station SD's on all floors.
FIRE-Final Inspection5/1/20075/1/20075/1/2007 PART
Approved for TOC.
BLD-Final4/27/20074/30/20074/30/2007AFAIL
DetailsDave Hannah
Darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trades signed off
FIRE-Final Inspection4/27/20074/30/20074/30/2007AFAIL
DetailsForrest France
Noted several issues including door hardware, signage, addressing, exit signs, some fire alarm and sprinkler issues as noted on a 12 item correction notice left on site and discussed with the general and sub contractors.
BLD-Framing/Rough-in1/8/20071/9/20071/9/2007APART
DetailsDave Hannah
darrell ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith first floor corrador ok to cover
BLD-Energy code compliance12/29/200612/29/20061/2/2007PPASS
DetailsDave Hannah
Daryl; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett first and second floor
BLD-Energy code compliance12/20/200612/20/200612/20/2006PPART
DetailsDave Hannah
Daryl; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok to cover second floor appartments
BLD-Framing/Rough-in12/14/200612/15/200612/15/2006APART
DetailsDave Hannah
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to insulate 1st and 2nd floors
BLD-Framing/Rough-in11/29/200611/30/200611/30/2006APART
DetailsDave Hannah
darrell ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover third flr room walls only
BLD-Energy code compliance11/22/200611/24/200611/24/2006APART
DetailsDave Hannah
DARRELL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover third floor room walls
BLD-Framing/Rough-in11/17/200611/20/200611/20/2006APART
DetailsDave Hannah
Darrel; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to insulate the third floor
BLD-Other11/14/200611/15/200611/15/2006APART
DetailsDave Hannah
darrell Note: drywall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles first layer of sheetrock 4th and 5th floor
BLD-Energy code compliance11/7/200611/8/200611/8/2006APART
DetailsDave Hannah
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover 4th floor wall rooms only
BLD-Framing/Rough-in11/1/200611/2/200611/2/2006APART
DetailsDave Hannah
Daryl; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop ok to insulate the 4th and 5th floor units
BLD-Conference6/8/20066/9/20066/9/2006ADONE
DetailsDave Hannah
request per Dixie for her and Troy to do a conference
BLD-Conference6/8/20066/9/20066/9/2006APART
DetailsLee Rice
request per Dixie for her and Troy to do a conference..two inspectors short...had to bypass meeting.