BLD-Aging Inspection | 9/4/2006 | 9/4/2006 | 9/5/2006 | | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 6/30/2006 | 7/3/2006 | 7/3/2006 | P | CANC |
Mike Jordan
|
|
|
Building final. Call and I'll meet you there.; Phone #: ###-#### Internet Inspection Request from: Danielle Groat
|
Code Occupancy Approval | 7/3/2006 | 7/3/2006 | 7/3/2006 | P | PASS |
Scott M.Brown
|
|
|
LANDSCAPE IN, OK TO RELEASE BOND AND SIGN FINAL
|
BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 | P | PASS |
Mike Jordan
|
|
|
Drawings & sign off card will be on desk by popcorn machine///dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chile. ok for perm occ. can not verify code enforcement or public works finals.
|
BLD-Aging Inspection | 5/22/2006 | 5/22/2006 | 5/22/2006 | | PASS |
Mike Jordan
|
|
|
Callled Big D builders, Additional entrance/exit has been constructed. Landscapping should be completed by tomorrow. Contractor to get finaled off by the end of the week.
|
FIRE-Final Inspection | 3/20/2006 | 3/20/2006 | 3/21/2006 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled. Resubmitted plans shows single street acces for fire dept.
|
BLD-Final | 3/16/2006 | 3/17/2006 | 3/17/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/16/2006 at 2:30:19 PM. Contact: ###-####. Ok for temp. occ. Needs to reinstall restroom grab bars to the right dimensions off the wall. Install insulation to bottom of floor decking at interior demizing walls.
|
FIRE-Final Inspection | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire alarm permit is finaled. Elevator is not to be used. All other life safety items are ok.
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | P | CANC |
Troy Cobbley
|
|
|
no time for inspection
|
Code Occupancy Approval Temp | 3/14/2006 | 3/14/2006 | 3/14/2006 | P | FAIL |
Scott M.Brown
|
|
|
No landscape yet. Needs to bond for a total of $12,775 required under DRH05-00193.
|
BLD-Other | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/2/2006 at 3:30:38 PM. Contact: ###-####. Insprcted ceiling grid upstairs. Floating system installed. Needs to submit a ceiling plan. Also inspected anchoring of racking in warehouse. Appears to be installed as per plan.
|
BLD-Energy code compliance | 1/30/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/30/2006 at 1:05:40 PM.
|
BLD-Framing/Rough-in | 1/23/2006 | 1/24/2006 | 1/24/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/23/2006 at 11:59:53 AM. Contact: ###-####. Noted to contractor to check on rated constructio for riser room.
|
BLD-Foundation | 11/9/2005 | 11/10/2005 | 11/10/2005 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/9/2005 at 2:33:01 PM. Contact: ###-####.
|
BLD-Footing | 11/7/2005 | 11/8/2005 | 11/8/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/7/2005 at 3:43:58 PM. Contact: ###-####. Step footing at loading dock is not continous and not per detail. Special inspector to verify repair.
|
BLD-Foundation | 11/1/2005 | 11/2/2005 | 11/2/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/1/2005 at 9:55:28 AM. Contact: ###-####. perimeter stemwalls, interior column pad footings.
|
BLD-Foundation | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Jim Sly
|
|
|
rick slama; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Footing and pads for main portion of bldg OK... No special insp req. 2500
|