BLD-Final | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/19/2006 at 3:22:43 PM. Contact: ###-####. l/c isued.
|
DOC - Permit Finaled | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. Door to the maintanence office has been removed until the new door hardware has been installed.
|
FIRE-Final Inspection | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | FAIL |
Forrest France
|
|
|
One exit discharge light at the courtyard is not operable, the manual exit pushbutton at the access controlled egress doors at two locations in phase two are not functional, need to add one emergency light in the corridor frist floor outside confrence rooms, provide lever hardware at the maintenance office door.
|
BLD-Final | 4/17/2006 | 4/18/2006 | 4/18/2006 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/17/2006 at 8:57:51 AM. Contact: ###-####. door must latch upon self closer.
|
FIRE-Final Inspection | 4/17/2006 | 4/18/2006 | 4/18/2006 | P | NR |
Forrest France
|
|
|
The project related alarm and sprinkler permits must be completed and approved prior to request for life safety final inspection.
|
BLD-Conference | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/4/2006 at 4:25:47 PM. Contact: ###-####. c/n to have arch submit exit signage and type for courtyard.
|
BLD-Framing/Rough-in | 3/1/2006 | 3/2/2006 | 3/2/2006 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/1/2006 at 12:27:49 PM.
|
BLD-Framing/Rough-in | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/16/2006 at 8:22:53 AM. Contact: ###-####.2nd floor ok
|
BLD-Framing/Rough-in | 2/10/2006 | 2/13/2006 | 2/13/2006 | A | PASS |
Jim Storey
|
|
|
rolled from fri need first thing monday. 301 third floor ok
|
BLD-Framing/Rough-in | 2/9/2006 | 2/10/2006 | 2/10/2006 | P | DEFR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/9/2006 at 9:14:04 AM. Contact: ###-####. to monday am.
|
FIRE-Final Inspection | 1/30/2006 | 1/30/2006 | 1/30/2006 | A | PART |
Forrest France
|
|
|
Temporary occupancy approval granted per S. Rogers.
|
BLD-Final | 1/25/2006 | 1/26/2006 | 1/27/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/25/2006 at 12:44:23 PM. first phase ok for occ. letter of compliance isued for this phase.
|
FIRE-Final Inspection | 1/26/2006 | 1/27/2006 | 1/27/2006 | A | PART |
Forrest France
|
|
|
Life safety c/n items have been completed, life safety is satisfactory for the phase 1 portion of the remodeled building as related to the fire alarm permit phased work. Fire life safety final pending completion of the phase 2 alarm work under permit FIR05-00712.
|
FIRE-Final Inspection | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | FAIL |
Forrest France
|
|
|
Provide an additional fire extinguisher for the great room/kitchen and lobby area as the distance to the nearest extinguisher from these spaces exceeds maximum travel allowed, provide approved hardware at the FACP room door, provide approved hardware at the pool enclosure gate meeting IFC 2003 1008.1.8.2 for height requirements.
|
BLD-Final | 1/20/2006 | 1/23/2006 | 1/23/2006 | P | NR |
Jim Storey
|
|
|
|
BLD-Final | 1/19/2006 | 1/20/2006 | 1/20/2006 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/19/2006 at 3:29:30 PM. Contact: ###-####.
|
FIRE-Final Inspection | 1/19/2006 | 1/20/2006 | 1/20/2006 | A | NR |
Forrest France
|
|
|
The project related fire alarm and sprinkler must both pass field inspection prior to final building life safety approval.
|
FIRE-Alarm Testing | 1/19/2006 | 1/20/2006 | 1/20/2006 | A | CANC |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Framing/Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 | A | PASS |
Jim Storey
|
|
|
ceiling insp --lavor ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 1/4/2006 | 1/4/2006 | 1/4/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 8:09:36 AM. first floor hard lid ok for cover.
|
BLD-Framing/Rough-in | 12/27/2005 | 12/28/2005 | 12/28/2005 | A | PART |
Jim Storey
|
|
|
lamar smith; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa alarm conduit instalation started all rm. 1st phase.
|
BLD-Framing/Rough-in | 12/21/2005 | 12/21/2005 | 12/21/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/21/2005 at 8:55:45 AM. 1 st floor walls ok need to restore ceilling at elavator.
|
BLD-Framing/Rough-in | 12/12/2005 | 12/12/2005 | 12/12/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/12/2005 at 10:55:16 AM. lobby 1 st floor hard lid and fire stopping ok.
|
BLD-Framing/Rough-in | 12/8/2005 | 12/9/2005 | 12/9/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/8/2005 at 2:58:13 PM. drag sturt ok 1st floor/3rd floor ok to cover.
|
BLD-Framing/Rough-in | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PART |
Jim Storey
|
|
|
around 3:30 reinsp 2&3 floors2nd floor ok
|
BLD-Framing/Rough-in | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 1:40:05 PM.
|
FIRE-Conference | 11/28/2005 | 11/29/2005 | 11/29/2005 | A | DONE |
Forrest France
|
|
|
On site visit regarding drive through canopy fire sprinkler coverage.
|
BLD-Framing/Rough-in | 11/23/2005 | 11/29/2005 | 11/29/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/23/2005 at 12:44:34 PM.
|
BLD-Framing/Rough-in | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/14/2005 at 4:40:09 PM. beam protection and coridor at servery ok.
|
BLD-Framing/Rough-in | 11/10/2005 | 11/14/2005 | 11/14/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/10/2005 at 12:22:37 PM. beam weld conections per engineering weld spec.
|
BLD-Framing/Rough-in | 11/3/2005 | 11/4/2005 | 11/4/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/3/2005 at 3:56:07 PM. servery and loby south end ok to cover pending others aprovals.
|
BLD-Framing/Rough-in | 11/1/2005 | 11/2/2005 | 11/2/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/1/2005 at 3:04:59 PM. lurndy rm ok ul listing of pipe fire stopping. ok for cover.
|
BLD-Framing/Rough-in | 10/31/2005 | 11/1/2005 | 11/1/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/31/2005 at 4:03:12 PM. Need UL listing for penetrations of plumbing in 1hr wall at new guest laundry room. Also needs elec. ri at shaft wall.
|
BLD-Framing/Rough-in | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/25/2005 at 8:26:17 AM. laundery rm and work out rm ok for cover.
|
BLD-Framing/Rough-in | 10/17/2005 | 10/18/2005 | 10/18/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/17/2005 at 1:44:42 PM. Contact: ###-####. roof ok/ sheer ok/c/n for roof/ceilling penatrations.
|