Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-02358
StatusFinaled
Name COLLIER'S INTERNATIONAL
Site Address 755 W FRONT ST Unit: 300
Project NameCOLLIERS INTERNATIONAL BODO 7
Customer Number 
ePlanReviewNo
Description
(COLLIERS INTERNATIONAL(RCE - 8702) - BODO BLDG #7 - 3RD STORY) This building is fire sprinklered for fire area and to allow the multitheater complex. To construct a 10,130 square foot office tenant space located on the 3rd story of "BODO Building #7". The building shell was constructed under permit BLD04-01324. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, interior doors, interior windows, suspended ceilings, millwork, and finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/3/20065/4/20065/4/2006PPASS
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
FIRE-Final Inspection5/3/20065/4/20065/4/2006ADONE
DetailsForrest France
Duplicate inspection request already completed.
FIRE-Final Inspection5/3/20065/4/20065/4/2006APASS
DetailsForrest France
Project related alarm and sprinkler permits have been finaled, fire life safety passed inspection.
Permanent Occupancy 5/4/20065/4/2006 DONE
Details
BLD-Final5/2/20065/3/20065/3/2006PCANC
DetailsDave Hannah
john ###-####
FIRE-Final Inspection5/3/20065/3/20065/3/2006AFAIL
DetailsForrest France
The project related sprinkler permit has not been requested for final inspection.
FIRE-Final Inspection5/2/20065/2/20065/3/2006PNR
DetailsForrest France
The project related fire sprinkler permit must be finaled before life safety final approval.
BLD-Final5/2/20065/2/20065/2/2006PCANC
DetailsDave Hannah
John; Phone #: ###-#### Internet Inspection Request from: Ione Coleman
BLD-Final4/25/20064/26/20064/26/2006PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need to get fire final
FIRE-Final Inspection4/25/20064/26/20064/26/2006AFAIL
DetailsForrest France
Three new offices have been built at the NE corner resulting in overspaced sprinklers, and possible alarm notification issues.
BLD-Other2/9/20062/9/20062/9/2006 DONE
Temp. Occ. Cert. # 5327 extended for 90 days per Jenifer thru 5-29-06.
BLD-Final11/29/200511/29/200511/29/2005PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ needs other trades to go perm and fire coulk elec conduits in floor of mop room and install glassing
FIRE-Final Inspection11/28/200511/29/200511/29/2005APART
DetailsForrest France
Fire life safety is satisfactory, final pending shell permit finals.
BLD-Final11/23/200511/25/200511/25/2005ACANC
DetailsDave Hannah
tony ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection11/23/200511/25/200511/25/2005AFAIL
DetailsForrest France
Emergency lights in three locations did not function, need to add one emergency light for the path of egress as marked on the approved plans.
BLD-Final11/22/200511/23/200511/25/2005ANR
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final11/21/200511/22/200511/23/2005PCANC
DetailsDave Hannah
john; Phone #: ###-#### Note: late afternoon Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection11/21/200511/22/200511/22/2005PCANC
DetailsForrest France
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in11/17/200511/17/200511/17/2005PPART
DetailsJim Storey
requests first thing after lunch//ceiling inspection///john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ceilling ok all but rated wall at stairs through penatrations ele. must be firestopped and reinsp.
BLD-Framing/Rough-in11/14/200511/14/200511/15/2005PPART
DetailsDave Hannah
celing insp -- jon; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover se area after fire sprinkler rough in ok to set perm tiles
BLD-Energy code compliance10/24/200510/25/200510/26/2005PPASS
DetailsDave Hannah
john; Phone #: ###-#### Note: fire calking also Internet Inspection Request from: Cathy Chiles ok to cover atrium
BLD-Other10/20/200510/21/200510/24/2005APART
DetailsDave Hannah
fire caulking of the electrical conduit inside the walls please////pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore all floor penatrations fire protected ok to cover
BLD-Energy code compliance10/17/200510/18/200510/18/2005PPASS
DetailsDave Hannah
JOHN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance10/14/200510/17/200510/18/2005PCANC
DetailsDave Hannah
insp for insulation and vapor barrier//john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance10/13/200510/14/200510/17/2005PCANC
DetailsDave Hannah
john Note: right after lunch if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in10/12/200510/13/200510/14/2005APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in10/13/200510/13/200510/14/2005PPASS
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate and cover int walls
BLD-Framing/Rough-in10/10/200510/11/200510/12/2005PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/10/2005 at 1:46:35 PM. Contact: ###-####. john needs plumb and elec r/is