Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
BLD-Aging Inspection | 10/25/2006 | 10/25/2006 | 10/25/2006 | | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 8/15/2006 | 8/15/2006 | 8/15/2006 | A | PART |
Jim Storey
|
|
|
Internet Inspection Request from: paul thornton pending p&z sign off.
|
FIRE-Final Inspection | 8/10/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Energy code compliance | 5/18/2006 | 5/18/2006 | 5/18/2006 | P | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 5/15/2006 | 5/16/2006 | 5/16/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton
|
BLD-Framing/Rough-in | 5/12/2006 | 5/12/2006 | 5/12/2006 | A | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton
|
BLD-Wall cover | 4/16/2006 | 4/17/2006 | 4/17/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Shear nailing ok, exterior walls built with 2x4, plans call for 2x6. Also noted that plans call for 5/8 type X inside and outside exterior walls on all sides for 1hr. rating, which may not be applicable due to fire seperation distances. Contractor to contact architect to resolve issues.
|
BLD-Concrete | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | PART |
Mike Jordan
|
|
|
interior footing and rebar lookie; Phone #: ###-#### Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 3/2/2006 | 3/2/2006 | 3/2/2006 | P | PASS |
Mike Jordan
|
|
|
Adrian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PART |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 2/25/2006 | 2/27/2006 | 2/27/2006 | A | DONE |
Mike Jordan
|
|
|
9 am: ITI will inspect rebar in wall as per Lochsa directive. Internet Inspection Request from: Adrian Marriage
|
BLD-Foundation | 2/22/2006 | 2/23/2006 | 2/23/2006 | P | FAIL |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Improper vert spacing, clearance issues. Needs RFI from engineer for epoxy of missing verts, also will requier special insp. on epoxy.
|
BLD-Footing | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | NR |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|