Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
BLD-Final | 8/30/2006 | 8/30/2006 | 8/30/2006 | A | PASS |
Mike Jordan
|
|
|
Temp occ given. Will be ok for perm occ once code enforcement finals.
|
BLD-Final | 8/11/2006 | 8/11/2006 | 8/11/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs code enforcement final.
|
FIRE-Final Inspection | 7/28/2006 | 7/28/2006 | 7/28/2006 | P | PASS |
Forrest France
|
|
|
Life safety is satisfactory, inspection passed.
|
BLD-Energy code compliance | 4/16/2006 | 4/17/2006 | 4/17/2006 | A | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/14/2006 | 4/14/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs to complete fire caulking, get repair for broken A40 and 41 trusses from engineer. Also correct glazing in windows at the (3/4 hour) for fire speration distance. 5/8 type X required on inside also. ok to insulate.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. could not locate approved plans or truss engineering.
|
BLD-Wall cover | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PART |
Mike Jordan
|
|
|
shear inspection ready to side Internet Inspection Request from: paul thornton. Shear nail insp. on exterior walls.
|
BLD-Concrete | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Mike Jordan
|
|
|
interior footings and rebar lookie. Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 3/2/2006 | 3/2/2006 | 3/2/2006 | P | PASS |
Mike Jordan
|
|
|
Adrian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 2/25/2006 | 2/27/2006 | 2/27/2006 | A | DONE |
Mike Jordan
|
|
|
9 am: ITI will inspect rebar in wall as per Lochsa directive. Internet Inspection Request from: Adrian Marriage
|
BLD-Foundation | 2/23/2006 | 2/23/2006 | 2/23/2006 | P | FAIL |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Improper vert spacing, clearance issues. Needs RFI from engineer for epoxy of missing bar. Will also need special insp for epoxy.
|
BLD-Footing | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | NR |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|