BLD-Final | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | PASS |
Dave Hannah
|
|
|
paul fishley; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
FIRE-Final Inspection | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | PASS |
Troy Cobbley
|
|
|
Related alarm and sprinkler permits are approved, life safety finaled.
|
Permanent Occupancy | | 4/5/2006 | 4/5/2006 | | DONE |
|
|
|
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5319 extended for 90 days per Jenifer thru 5-22-06
|
FIRE-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Forrest France
|
|
|
Items on the correction notice issued 11/22 have been completed, final pending alarm resubmittals for device address changes and shell permit finals for alarm and sprinkler.
|
BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Dave Hannah
|
|
|
Forest will sign-off arround 1:00 pm. Please come to inspect shortly after. Thanks. Internet Inspection Request from: Alex Monge ok for temp occ ok to go perm after others go perm and shell is cc
|
BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | NR |
Dave Hannah
|
|
|
Please call when you arrive. Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | FAIL |
Forrest France
|
|
|
Lower the height of the provided fire extinguisher to 48" AFF, provide missing sprinkler escutcheon, remove tape from heads in the restrooms, provide additional emergency light in the back room as discussed.
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | NR |
Forrest France
|
|
|
The related fire alarm permit must be inspected and approved prior to life safety final.
|
BLD-Final | 11/16/2005 | 11/21/2005 | 11/21/2005 | A | NR |
Tom Arcoraci
|
|
|
Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 11/16/2005 | 11/21/2005 | 11/21/2005 | A | NR |
Forrest France
|
|
|
The related fire alarm permit work must be inspected and approved prior to life safety inspection and final.
|
FIRE-Sprinkler Rough-in | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | CANC |
Forrest France
|
|
|
Wrong inspection type called in by the general contractor, was intended for the sprinkler permit.
|
BLD-Wall cover | 10/31/2005 | 10/31/2005 | 11/1/2005 | P | PASS |
Dave Hannah
|
|
|
Please call Dennis Harter. Internet Inspection Request from: Alex Monge ok to cover wall ok to cover ceiling after fire proofing is patched
|
BLD-Wall cover | 10/20/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
Cover-up inspection at Tully's. Early AM please. Internet Inspection Request from: Alex Monge hard lid and walls ok but need all other trades signed of do not cover
|
BLD-Wall cover | 10/20/2005 | 10/21/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
Cover-up inspection at Tully's. Early AM please. I mistakenly scheduled you for Monday. Sorry. Internet Inspection Request from: Alex Monge ok to cover top 6ft of walls
|