DOC - Permit Finaled | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the curbing has been painted for the fire dept. access.
|
BLD-Final | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | NR |
Jim Sly
|
|
|
Phone #: Dana ###-####
|
BLD-Energy code compliance | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Jim Sly
|
|
|
dana; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/19/2006 at 1:36:34 PM. Contact: ###-####. Just need to check lateral bracing for trusses restrained min. 1 end. and complete draftstop at W. end soffit.
|
BLD-Framing/Rough-in | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | PART |
Dave Hannah
|
|
|
Dana -- shear insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong letter from engineer oking sw2 sear panel as is ok to cover ext will add sheet rock shear to inside
|
BLD-Other | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Jim Sly
|
|
|
danna - Note: shear ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Shear......OK except SW2 wall.......Need letter from Eng or nail 10d at 2/12
|
BLD-Foundation | 1/27/2006 | 1/30/2006 | 1/30/2006 | A | PASS |
Jim Sly
|
|
|
west; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | PASS |
Jim Sly
|
|
|
wes ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Called Eng....2500 psi design on Conc.
|