FIRE-Final Inspection | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Forrest France
|
|
|
Required correction for the fire dept. access curb painting has been verified for completion, final inspection passed.
|
Permanent Occupancy | | 8/2/2006 | 8/2/2006 | | DONE |
|
|
|
|
Code Occupancy Approval Temp | | | 7/14/2006 | | |
|
|
|
Signed Temporary w/bond in place on 7/6/2006
|
FIRE-Final Inspection | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the curbing has been painted for the fire dept. access.
|
BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PEND |
Jim Sly
|
|
|
dana - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley OK for Temp or Perm Occ...........when fire signs for temp or perm, and when bond for landsc complete.
|
FIRE-Final Inspection | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | CANC |
Troy Cobbley
|
|
|
dana - call prior to insp; Phone #: ###-#### I spoke to the contractor on the phone and he stated that he needed a temporary occupancy until he had the curbing changed per the fire dept requirements. Also no pavement was installed yet. I told him no.
|
BLD-Aging Inspection | 4/6/2006 | 4/6/2006 | 4/6/2006 | | DONE |
Jim Sly
|
|
|
WIP
|