BLD-Final | 9/29/2009 | 9/30/2009 | 9/30/2009 | A | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 9/30/2009 | 9/30/2009 | 9/30/2009 | A | BOND |
Terry Records
|
|
|
Grading and drainage is conditionally approved upon receipt of $57,948.00 surety for rebuilding the keystone retaining walls that are failing. According to Vicki descalfani bond has been submitted.
|
BLD-Final | 9/23/2009 | 9/24/2009 | 9/24/2009 | A | PART |
Dave Hannah
|
|
|
gary- after 9am Phone #: ###-#### c/n items complete but still needs hillside final or bond
|
BLD-Final | 9/11/2009 | 9/14/2009 | 9/14/2009 | A | FAIL |
Dave Hannah
|
|
|
Gary Phone #: ###-#### needs terry records final also needs to close up openings along sides of front steps on to deck ladder in window well and fire stop openings in garage
|
BLD-Conference | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 8/17/2006 | 8/17/2006 | 8/18/2006 | P | DONE |
Dave Hannah
|
|
|
travis; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Energy code compliance | 8/17/2006 | 8/18/2006 | 8/18/2006 | A | PASS |
Dave Hannah
|
|
|
travis; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | FAIL |
Mike Jordan
|
|
|
travis; Phone #: ###-#### Note: please cal 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles. Needs to fireblock above arches upstairs. ok to insul. c/n posted.
|
BLD-Framing/Rough-in | 7/27/2006 | 7/28/2006 | 8/1/2006 | A | FAIL |
Dave Hannah
|
|
|
travis - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs to fire block
|
BLD-Other | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | PASS |
Dave Hannah
|
|
|
TRAVIS nOTE: SHEAR WALL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ext walls
|
BLD-Framing/Rough-in | 5/22/2006 | 5/24/2006 | 5/24/2006 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 12:02:33 PM. Contact: ###-####.shear walls needs tobe fixed
|
BLD-Foundation | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2005 at 3:07:22 PM. Contact: ###-####.ok to place concrete after crew adds some #4 bar to retainning wall sections
|
BLD-Footing | 11/9/2005 | 11/10/2005 | 11/14/2005 | A | PASS |
Dave Hannah
|
|
|
bob eason; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|