Permit Information
Permit NumberBLD05-02498
StatusFinaled
Name BOISE ORTHODONTICS
Site Address 2136 N COLE RD
Project NameCOLE PROFESSIONAL CENTER
Customer Number 
ePlanReviewNo
Description
(BOISE ORTHODONTICS) Interior remodel to a 3,267 sq. ft. portion of an existing office building for a new orthodontic office tenant per approved plans. The tenant will occupy a 2,561 sq. ft. area on the first floor and a 706 sq. ft. area of the basement. Work to include some miscellaneous interior demolition work, some new interior walls and doors, interior finish, some ceiling and soffit work, some new sinks and casework, upgrading two restrooms to meet current accessibility standards, providing accessible door hardware throughout the space, mechanical work, plumbing work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/30/200611/30/200611/30/2006 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/26/20069/26/20069/26/2006 PASS
DetailsTom Arcoraci
on temp
BLD-Aging Inspection7/27/20067/27/20067/27/2006 PASS
DetailsTom Arcoraci
on temp occ
BLD-Aging Inspection4/12/20064/12/20064/12/2006 PASS
DetailsTom Arcoraci
BLD-Final2/9/20062/10/20062/10/2006PPASS
DetailsTom Arcoraci
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
FIRE-Final Inspection2/9/20062/10/20062/10/2006APASS
DetailsTroy Cobbley
Life safety finaled. Locksmith was on the way to remove the thumbturns
Permanent Occupancy 2/9/20062/9/2006 DONE
Details
FIRE-Final Inspection2/2/20062/3/20062/3/2006AFAIL
DetailsTroy Cobbley
Mount fire extinguisher as discussed in the first floor tenant and provide an additional fire extinguisher in the basement lobby. The two exterior lobby exits are allowed to have the keyed hardware, indicators and stickers. All of the other doors for the new tenant as shown on theplans are required to have approved hardware such as lever, pad or crash bar.
BLD-Final2/2/20062/3/20062/3/2006PCANC
DetailsTom Arcoraci
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa//Cancel per Matt (RASchultz) 2-3-06 eus
BLD-Framing/Rough-in12/8/200512/9/200512/9/2005APASS
DetailsTom Arcoraci
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Conference11/30/200511/30/200512/2/2005PDONE
DetailsForrest France
Discussed exit signage, emergency lighting, and pocket door hardware requirements on site.
BLD-Conference11/15/200511/15/200511/15/2005PPASS
DetailsTom Arcoraci
discussed handrails
BLD-Conference11/14/200511/15/200511/15/2005ACANC
DetailsTom Arcoraci
on hand rails please///matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled11/15/200511/15/200511/15/2005PPASS
DetailsTom Arcoraci