Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02539
StatusFinaled
Name WRIGHT BROTHERS, THE BLDG CO
Site Address 11818 W JOPLIN RD
Project NameWEST BOISE WWTP
Customer Number 
ePlanReviewNo
Description
(WEST BOISE WWTP - OFFICE & EDUCATION FACILITY) (3/14/08 Plan Modification submitted for minor changes to include but not be limited to underground plumbing rerouting and the waterless urinals added (previously approved on plans by Lee), a new heat pump added, a rooftop mechanical unit relocated, electrical low voltage lighting added, revised energy compliance sheets for electrical and mechanical, interior nonbearing wall around the theater was changed from a 90 degree angle to a curve, an added sheet to show a beam change over the exhibit area (which was left out of the previous plan modification), minor interior finish changes, added details on counters (which can be reviewed and approved on site for accessibility compliance), minor site changes and some basic plan clarifications.) (5/15/07 Plan Modification submitted to remove the above ground construction of the observation tower and pour foundation only at this time.) To construct a 9,155 sq. ft. one story Type IIB, fully fire sprinkled exhibit hall with offices. This building is designed for unseparated uses and the building is to be fully fire sprinklered. Occupant load signage to be posted in Theater (85 persons); in the Interp/Lobby (148 persons); and in Gallery (42 persons) -see ltr. approved by G. Slane 12/7/07 attached to documents. Other work includes all site improvements, paving and landscaping per approved plans, CUP04-00137. (mlo)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval4/28/20083/28/20084/28/2008PPASS
DetailsCarol Montgomery
Everything has been completed per the plans signed and approved and on site. Compliance Met. Closed.
FIRE-Conference4/25/20084/25/20084/25/2008PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final4/2/20084/3/20084/3/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
OK for Perm Occ.
BLD-Final3/24/20083/25/20083/25/2008PNR
DetailsJim Sly
jade - ###-####
Talked to Jade......Can't final until plumb finals. ACHD?
FIRE-Final Inspection3/24/20083/24/20083/24/2008PPART
DetailsTroy Cobbley
A temporary occupancy was given, with dave hannimans permission, until the fire lane to the northwest has been completed. All other items are passed.
Code Occupancy Approval Temp  3/14/2008 DONE
Bond has been received and in place on CUP04-00137. Temporary signed.
BLD-Conference3/11/20083/12/20083/12/2008ADONE
DetailsJim Sly
mike Note: also with George please Phone #: ###-####
C/N Do not proceed with any work that is not contained within a set of approved plans located at jobsite......Changes and addendums to the original approved plans to be included as a complete set of drawings of what is built.
BLD-Conference3/11/20083/11/20083/11/2008PPASS
DetailsJim Sly
Set up meeting 3/12/08.....
BLD-Conference3/10/20083/10/20083/10/2008PCANC
DetailsJim Sly
mike Phone #: ###-####
Code Occupancy Approval Temp3/6/20083/6/20083/6/2008PCANC
DetailsCarol Montgomery
N/R - need to post bond $69,000.00+ for temporary. Called Cathy and gave her information for bonding
BLD-Energy code compliance12/31/20071/2/20081/2/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
BLD-Framing/Rough-in12/19/200712/20/200712/20/2007APASS
DetailsJim Sly
for cover please-Mike Phone #: ###-####
BLD-Framing/Rough-in11/20/200711/21/200711/21/2007APASS
DetailsJim Sly
mike - exterior part 2 of 2 Phone #: ###-####
BLD-Other11/7/200711/7/200711/7/2007PPART
DetailsJim Sly
Exterior for cover for part 1 of 2--Mike; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
S and E walls OK
BLD-Other11/1/200711/2/200711/2/2007AFAIL
DetailsMike Jordan
mike Note: cover on the admin bld Phone #: ###-####. On site to inspect soffitt, noted type 2b const. Contractor has placed non fire rated osb behind soffitt. No combustibles allowed. Did note that plans on site called for osb, but were not the approved set. will reshedule for Monday and have approved set of drawings.
BLD-Framing/Rough-in10/25/200710/26/200710/26/2007APART
DetailsJim Sly
mike - metal steel - interior and exterior Phone #: ###-####
Talked to Mike about 3 studs required at all roof joist point loads ( 1 area ) and 1 area with studs offset at point load......will address with Engineer. After Engineer and STRATA ok..........OK to cover exterior.
BLD-Concrete9/24/20079/24/20079/24/2007PPASS
DetailsJim Sly
craig Note: late afternoon please for inspection Phone #: ###-####
Remainder of CMU....trash and radius walls....OK
BLD-Concrete9/20/20079/21/20079/21/2007PPART
DetailsJim Sly
Greg Phone #: ###-####
CMU wall at radius wall and walls for trash enclosures appear OK up to 4' high......
BLD-Wall cover7/17/20077/18/20077/18/2007PPART
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Wall and interior column pads OK pending special insp, and tests by STRATA
BLD-Footing7/11/20077/11/20077/11/2007PPART
DetailsJim Sly
mike - rebar Phone #: 308-
South and part of E wall......2nd 5' lift......OK pend special insp (strata) tests and approvals.
BLD-Footing7/5/20077/6/20077/6/2007APART
DetailsJim Sly
mike - rebar Phone #: ###-####
Rebar at tower columns and walls OK pending special insp/ Rick Cummings and Tests and approvals from STRATA.
BLD-Footing6/29/20076/29/20076/29/2007PPART
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Select footings and wall (5' lift)........OK pending special insp..........and testing by STRATA.
BLD-Other6/26/20076/26/20076/26/2007PPART
DetailsJim Sly
mike Note: rebar Phone #: ###-####
Footing OK for Observation tower pending rebar insp by Rick Cummings (Certified reinforced concrete special insp) and tests and approvals from STRATA .
BLD-Footing6/20/20076/20/20076/20/2007PPART
DetailsJim Sly
dave - ###-####
OK pending special inspection by Rick Cummings.
BLD-Aging Inspection11/30/200611/30/200611/30/2006 PEND
DetailsJim Sly
Talked to architect........still out for bid.