BLD-Final | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | PASS |
Tom Arcoraci
|
|
|
scott - ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie; call for garage code
|
DOC - Permit Finaled | 8/21/2007 | 8/21/2007 | 8/21/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Grading Inspection | 8/20/2007 | 8/20/2007 | 8/20/2007 | | BOND |
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, final grading and approval for a six foot high retaining wall has not been completed. For this the engineer has recommended a bond of $1,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | FAIL |
Dave Hannah
|
|
|
carol - pls call for key code, ###-#### cell; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs terrys final
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Mike Jordan
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Energy code compliance | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Mike Jordan
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/27/2006 | 7/28/2006 | 7/28/2006 | P | PART |
Dave Hannah
|
|
|
carol; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley crew on site finishing fire blocking will check rest at energy insp ok to insulate
|
BLD-Framing/Rough-in | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | FAIL |
Dave Hannah
|
|
|
carol ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley c/n on site fire blockin do not insulate needs city aproved plans on site
|
FIRE-Sprinkler Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide approval notes that accompany the approved plans, tenting is inadequate and needs modified in several locations, provide additional hangers on the 1 1/2" main in the west end of the basement, sidewall heads in the garage appear to be overspaced and provide as-built drawings and hydraulic calculations that include all of the piping changes and hydraulic calculation changes including the slope from the street to the riser
|
BLD-Foundation | 1/4/2006 | 1/6/2006 | 1/6/2006 | A | PART |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa back walls for basement
|
BLD-Foundation | 12/28/2005 | 12/29/2005 | 12/29/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/28/2005 at 11:20:54 PM. Contact: ###-####.
|
BLD-Footing | 12/27/2005 | 12/28/2005 | 12/28/2005 | P | NR |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 12/23/2005 | 12/27/2005 | 12/28/2005 | A | NR |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|