Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02640
StatusFinaled
Name WESTROCK HOMES
Site Address 11165 W GREYLING DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2861sq.ft. Two story single family dwelling (1783sq.ft. Main floor / 1078sq.ft. Upper floor) with a 78sq.ft. Covered front porch, a 240sq.ft. Covered rear patio, a 994sq.ft. Attached four car garage, and a 24' X26' 624SQ.FT. DETACHED GARAGE per approved plans, all red-lining, Engineering, and plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1A setbacks/zoning per Colleen Carroll with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection5/16/20065/17/20065/17/2006PPASS
DetailsMike Jordan
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled5/17/20065/17/20065/17/2006PPASS
DetailsMike Jordan
BLD-Final5/17/20065/17/20065/17/2006PPASS
DetailsMike Jordan
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance3/15/20063/16/20063/16/2006APASS
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Framing/Rough-in3/15/20063/15/20063/15/2006PNR
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. wip when on site. needs to reshedule.
BLD-Framing/Rough-in3/13/20063/14/20063/14/2006APASS
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All framing issues have been resolved.
BLD-Framing/Rough-in3/10/20063/10/20063/10/2006PFAIL
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Complete lateral bracing and finish nailing off simpson hangars in garage. ok to insulate. c/n posted. No framing on detached garage.
BLD-Framing/Rough-in3/8/20063/9/20063/9/2006ANR
DetailsMike Jordan
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Could not find truss engineering or approved plans on site for framing inspection.
BLD-Foundation11/22/200511/22/200511/22/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/22/2005 at 7:22:18 AM. Contact: ###-####.
BLD-Footing11/22/200511/22/200511/22/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/22/2005 at 7:20:48 AM. Contact: ###-####.
BLD-Footing11/17/200511/18/200511/18/2005APASS
DetailsMike Jordan
dane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa