BLD-Final | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PASS |
Tom Arcoraci
|
|
|
hc company; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
DOC - Permit Finaled | 8/17/2006 | 8/17/2006 | 8/17/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | FAIL |
Troy Cobbley
|
|
|
Exit discharge lights did not work.
|
BLD-Conference | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | PASS |
Jim Sly
|
|
|
daren - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Conference | 5/18/2006 | 5/19/2006 | 5/19/2006 | A | DONE |
Troy Cobbley
|
|
|
I went over life safety items with Darren. Needs address on both corners of the building and to test the exit discharge lighting when complete.
|
BLD-Framing/Rough-in | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | PART |
Jim Sly
|
|
|
darin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Shear nailing OK...... Hold downs on exterior (of Ext) wall OK Retrofit HDs OK but need to be screwed to studs.......Epoxy inspected by special insp. Still working on draftstops.
|
BLD-Framing/Rough-in | 1/11/2006 | 1/12/2006 | 1/12/2006 | P | PART |
Jim Sly
|
|
|
re-bar inspection///pouring at 2:30 -- darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Foot OK Pending MTI special insp, tests, and approvals
|