Permit Information
Permit NumberBLD05-02671
StatusFinaled
Name IRISH QUALITY BUILDERS
Site Address 8600 W ELISA ST
Project NameIRISH AUTO REPAIR
Customer Number 
ePlanReviewNo
Description
Irish Auto Vehicle Repair Garage - To construct a new 5,136 square foot, CMU exterior wall, single story, vehicle repair garage, with a 395 square foot office and a 1,120 square foot mezzanie storage area. This building is nonseparate per Setion 302.3.1. All construction per the approved plans and attached comment list. MJP DRH05-00226
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 9/5/20069/5/2006 DONE
Details
Code Occupancy Approval8/2/20068/2/20068/2/2006PPASS
DetailsScott M.Brown
ALL IN AS REQUIRED AND FINAL SIGNED OFF 8-1-06
BLD-Final7/20/20067/21/20067/21/2006APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/20/2006 at 9:15:04 PM. Contact: ###-####.
OK for Temp Occ. OK to Perm... when Code enforce and Electr perms.......
BLD-Final7/19/20067/20/20067/20/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/19/2006 at 4:06:23 PM. Contact: ###-####. Needs public works sign off and to install code compliant handrail.
FIRE-Final Inspection7/17/20067/18/20067/18/2006APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection7/10/20067/11/20067/11/2006PFAIL
DetailsTroy Cobbley
Provide signage at the property entrance as discussed and provide the indicator at the lock on the main entrance/exit door.
BLD-Final7/10/20067/11/20067/11/2006PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/10/2006 at 8:09:06 PM. Contact: ###-####.needs code enforcement, public works and fire finals.
BLD-Other5/17/20065/18/20065/18/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/17/2006 at 2:56:23 PM. Contact: ###-####. Bldg framing insp, verified draftstop.
BLD-Conference5/11/20065/12/20065/12/2006APART
DetailsMike Jordan
Confirmed with Mike Jordan for 9:00 AM appt.; Phone #: ###-#### Internet Inspection Request from: misty evans. After meeting with architiect, and plan reveiw the S-1 and B occ. is not required to be seperated by 2hr. wall due to square footage being less than 10% in B occ. of total square footage.
BLD-Framing/Rough-in5/10/20065/11/20065/11/2006PPART
DetailsMike Jordan
christi; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Compressor room not complete. rogg framing and mezz. ok. Noted 2hr seperation wall, Need wall assembly from architect, Putty pads required on steel boxes, Also need verification of UL listing on installed door frames, no tags present. Also need UL listings on penetrations for fire caulking from elec. All pending mech ri. Ok to one side walls.
BLD-Foundation3/9/20063/10/20063/10/2006APASS
DetailsMike Jordan
eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing2/28/20063/1/20063/1/2006APART
DetailsMike Jordan
eric; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter footings. Contractor is getting special insp.