Permit NumberBLD05-02731
StatusFinaled
Name STEED CONSTRUCTION
Site Address 8201 W OVERLAND RD
Project NameOVERLAND RETAIL PLAZA
Customer Number 
ePlanReviewNo
Description
Overland Retail Plaza - (Shell) - To build a new 17,850 square foot, one story retail shell building and related site improvements. This building will be constructed on masonry exterior walls, wood roof trusses. This building will be fully fire sprinklered. The sprinklers are used for allowable area increase. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/21/200611/21/200611/21/2006PPASS
DetailsMike Jordan
DOC - Permit Finaled11/21/200611/21/200611/21/2006PPASS
DetailsMike Jordan
Letter og compliance issued for shell and core. PIV valve relocated to outside of bldg, therefore riser room no longer required to be 1 hr const. Also noted fire sprinklers at canopy area, draftstop not required as previously mentioned.
Code Occupancy Approval  11/21/2006 PASS
OBTAINED PLANNING APROVALS FOR CHANGES FINAL SIGNED OFF.
FIRE-Final Inspection11/9/200611/9/200611/9/2006APASS
DetailsForrest France
Required corrections have been verified for completion, shell fire life safety passed.
FIRE-Final Inspection11/6/200611/6/200611/6/2006AFAIL
DetailsForrest France
Missing fire dept. access curb lettering, address as posted is missing one number, need to final fire sprinkler permit prior to shell life safety final.
COD-Stop Work/Reinspection DR 8/18/20068/18/2006 FAIL
DetailsScott M.Brown
SITE NOT TO APPROVED DR APPROVAL. DRIVEWAY, PARKING LOT, REDUCED PARKING SPACES AND MISSING REQUIRED LANDSCAPE.
BLD-Framing/Rough-in5/25/20065/25/20065/25/2006PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/25/2006 at 8:20:43 AM. Contact: ###-####. Mech room is required to be 1hr. const. due to riser. Submit detail for 1hr wall and ceiling assembly.
BLD-Energy code compliance4/14/20064/14/20064/14/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/14/2006 at 9:32:53 AM. Contact: ###-####. Needs to provide fireblocking from toop of cmu wall to underneath side of roof deck at canopy area.
BLD-Framing/Rough-in3/30/20063/30/20063/30/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/30/2006 at 7:07:35 AM. Contact: ###-####.
BLD-Other3/16/20063/16/20063/16/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/16/2006 at 10:37:59 AM. Contact: ###-####. Roof sheating and hardware.
BLD-Foundation1/25/20061/26/20061/26/2006ADONE
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/25/2006 at 3:05:09 PM. Contact: ###-####. Not a foundation insp. Bldg. confrence. Reviewed all special insp reports for compliance on footings foundations and masonry wall constructed to date.